12. c2. Evaluation Grid.docx
EVALUATION GRID
SECTION 1: ADMINISTRATIVE AND TECHNICAL COMPLIANCE
SECTION 2: TECHNICAL QUALITY EVALUATION (for compliant tenders)
[supply offers which comply with the minimum quality levels, should be technically scored in case the award criterion is the most economically advantageous tender. If so, add a technical evaluation grid (setting out the technical criteria, sub-criteria and weightings):
| Contract title : | Hybrid Private 5G Network Extension (local UPF) | Publication reference : | MTender ID: ocds-b3wdp1-MD-1781161220358 |
Project ROMD00495 "CONNECTINNO"
| Tender No | Name of tenderer | Economic & financial capacity? (OK/a/b/…) | Professional capacity? (OK/a/b/…) | Technical capacity? (OK/a/b/…) | Compliance with technical specifications? (OK/a/b/…) | Ancillary services as required? (OK/a/b/…/NA) | Subcontracting statement? |
| (Y/N) | Other technical requirements in tender dossier? | ||||||
| (Yes/No/Not applicable) | Technically compliant? Y/N) | Justification/ |
notes:
1
2
3
Evaluator's name & signature
Evaluator's name & signature
Evaluator's name & signature
Date
| Criteria | Maximum score | Notes/Score |
| PRICE – Financial offer | 40 | Score = (Min Price / Offer Price) × 40p |
| TECHNICAL CHARACTERISTICS (total) | 40 | |
| Reserved bandwidth for UTM 5G network in 3.4–3.8 GHz spectrum | 20 | <5 MHz = 1p; |
5-20 MHz = score proportional (1 MHz = 1p ⇒ 15p for 20 MHz);
20-100 MHz = score proportional (20 MHz = 1p ⇒ 4p for 100 MHz).
[1p+15p+4p=20p]
| SLA compliance with target values from section 6.3.3 | 10 | SLA targets met = 8p; >10% above targets = 2p |
| Implemented functionalities (5G SA hybrid, dedicated UPF for UTM, network slicing compatible with 3GPP Release 16) | 10 | Non-implementation=DISQUALIFICATION; |
Full implementation (5G SA hybrid UPF + slicing 3GPP R16) = 10p
| IMPLEMENTATION TIME | 20 | |
| Time from contract signing to: (a) 5G radio coverage in UTM laboratory room AND (b) local UPF integration | 20 | Non-compliance=DISQUALIFICATION; Compliance with targets = 16p; |
Advancing network operationalization by 1 month = 4p
[16+4=20]
| OVERALL TOTAL SCORE | 100 |
Strengths
Weaknesses
Evaluator's name
Evaluator's signature
Date
Previzualizarea are caracter informativ. Doar originalul oficial din sursă are valoare juridică.