Translation from Romanian and Russian into English
2026-419
Reconstruction of the terminal
building of “Eugen Doga”
International Airport – Chisinau
(cadastral no. 0100120.236.01), with
partial replanning of premises and
extension in dimensions
Form No. 1B
(name of the facility) WinEstimate
Cost Estimate-Offer No. 2-13-1
Block 1A, 1B, 1C
Public Address System (PA)
(name of works)
Coefficient for basic wages = 1,1500
Coefficient for cost of machine operation = 1,1500
No. Norm symbol
and resource
code
Description of works
Unit of
measure
(U.M.)
Quantity
according to the
design data
1 2 3 4 5
1. Construction works
1 RpEJ08C
Execution of chases with depth up to 5
cm in stone or reinforced concrete walls,
5 × 50 cm²
m 2,500
7137010011520 Electrician in construction man-
hours
0,5750
2 RpEJ09D
Filling of chases in walls up to 50 cm²
m 2,500
7122050013442 Plasterer man-
hours
0,8625
2653102100830 Construction gypsum type A kg 4,2500
1421102200525 Sorted unwashed river and lake sand 0.0–7.0 mm m³ 0,0013
4100116202818 Water for mortars and concrete m³ 0,0250
2952270003817 Electric mortar mixer, 200 L machine-
hours
0,0431
2922140006703 Window crane, capacity 0.0015 meganewtons
(MN) (0.15 ton-force (tf))
machine-
hours
0,0575
Total
Social insurance
Transportation of materials
Procurement and storage expenses
1 2 3 4 5
Direct expenses
Overhead expenses
Total including overhead expenses
(CR)
Estimated profit
Total Construction works
2. Installation Works
3 10-08-
001-01
Receiving devices: Power amplifier
pieces 3,000
1 Worker man-
hours
82,8000
1011963 Pine rosin kg 0,0168
1012206 Plastic spacer dowels, screws 12 × 70 mm 10 pieces 1,2000
5220076 Tin-lead solder alloy without antimony, grade
POS40
kg 0,1680
330206 Electric drills machine-
hours
0,5520
4 10-04-
101-07
Subscriber equipment and miscellaneous
equipment: Megaphone or loudspeaker
column: indoor
pieces 80,000
1 Worker man-
hours
184,0000
1100014 Tirfon 100
pieces
0,8800
5440089
Insulating adhesive tape on polycasing
compound, brand “LSEPL” (ЛСЭПЛ), width 20–
30 mm, thickness 0.14–0.19 mm inclusive
kg 1,2000
5 10-04-
064-01
Desktop equipment: Desktop megaphone
pieces 30,000
1 Worker man-
hours
103,5000
1011665 Electro-insulating varnish “318” kg 0,6000
1012073 Coarse threads kg 0,4800
5220077 Tin-lead solder alloys without antimony, grade
“ПОС30” kg 0,20
kg 0,3000
5440089
Insulating adhesive tape on polycasing
compound, brand “LSEPL” (ЛСЭПЛ), width 20–
30 mm, thickness 0.14–0.19 mm inclusive
kg 0,3000
6 10-04-
101-07
Subscriber equipment and miscellaneous
equipment: Megaphone or loudspeaker
column: indoor
pieces 5,000
1 Worker man-
hours
11,5000
1100014
Стр. 2–3
0.19 mm inclusive kg 0,3000 6 10-04- 101-07 Subscriber equipment and miscellaneous equipment: Megaphone or loudspeaker column: indoor pieces 5,000 1 Worker man- hours 11,5000 1100014 Tirfon 100 pieces 0,0550 5440089 Insulating adhesive tape on polycasing compound, brand “LSEPL” (ЛСЭПЛ), width 20– 30 mm, thickness 0.14–0.19 mm inclusive kg 0,0750 1 2 3 4 5 7 08-02- 412-2 Pulling conductors into installed pipes and hoses: total cross-section up to 6 mm² 100 m 13,000 1 Worker man- hours 100,7630 1011764 Ground talc, grade I tonne 0,0078 1019852 Paint kg 0,2600 5009041 Clamping device – branch connector 100 pieces 4,0300 5009056 Insulating caps 10 pieces 10,4000 5009061 Insulating sleeve pieces 158,6000 5009140 Connection sleeves 100 pieces 0,6500 5009500 Marking tags 100 pieces 0,2600 5440089 Insulating adhesive tape on polycasing compound, brand “LSEPL” (ЛСЭПЛ), width 20– 30 mm, thickness 0.14–0.19 mm inclusive kg 2,0800 021102 Truck crane on automobile chassis for installation of technological equipment (except main pipelines), 10 tonnes machine- hours 0,2990 400002 Flatbed trucks, capacity up to 8 tonnes machine- hours 0,2990 8 UTP (Unshielded Twisted Pair) Category 5e cable 4 × 2 × 0.52 mm m 300,000 6004 UTP (Unshielded Twisted Pair) Category 5e cable 4 × 2 × 0.52 mm m 300,0000 9 Fire-resistant cable 1 × 2 × 1.5 mm² JE- H(St)H (Halogen-free installation cable with static screen) FE180 (Functional integrity 180 min) E30 (Circuit integrity 30 min) PH120 (Insulation integrity 120 min) m 1 000,000 6005 Fire-resistant cable 1 × 2 × 1.5 mm² JE-H(St)H (Halogen-free installation cable with static screen) FE180 (Functional integrity 180 min) E30 (Circuit integrity 30 min) PH120 (Insulation integrity 120 min) m 1 000,0000 10 08-02- 409-1 Vinyl plastic pipe on installed structures, on walls and columns, fixed with staples, diameter up to 25 mm 100 m 8,000 1 Worker man- hours 218,9600 1010813 Low-carbon steel wire for various purposes, galvanized, diameter 3.0 mm tonne 0,0168 1011924 Electrodes E42A, diameter 4 mm kg 7,6800 1019100 Cartridge for powder-actuated tool 10 pieces 107,2000 1019109 Connection dowels 10 pieces 107,2000 1139042 Adhesive “BMK-5k” kg 1,6000 5009030 Flanges 10 pieces 8,0000 5009031 Staples 10 pieces 53,6000
Стр. 3–5
for powder-actuated tool 10 pieces 107,2000 1019109 Connection dowels 10 pieces 107,2000 1139042 Adhesive “BMK-5k” kg 1,6000 5009030 Flanges 10 pieces 8,0000 5009031 Staples 10 pieces 53,6000 1 2 3 4 5 5009061 Insulating sleeve pieces 144,0000 5009070 Connections 10 pieces 14,4000 021102 Truck crane on automobile chassis for installation of technological equipment (except main pipelines), 10 tonnes machine- hours 1,0120 030902 Hydraulic elevators, lifting capacity 10 m machine- hours 145,3600 040502 Installations for manual electric arc welding (direct current) machine- hours 24,8400 331451 Electric hammer drills machine- hours 44,5280 400002 Flatbed trucks, capacity up to 8 tonnes machine- hours 1,0120 11 PVC-20 pipe (Polyvinyl Chloride) m 800,000 6007 PVC-20 pipe (Polyvinyl Chloride) m 800,0000 12 10-06- 037-12 Cabinets, boxes and junction boxes for conduit installations: Terminal box 100 pieces 0,160 1 Worker man- hours 4,5485 1010985 Hot-rolled carbon steel strip, grade St6sp, thickness 10–75 mm, width 100–200 mm tonne 0,0010 1019103 Spacer dowels 100 pieces 0,3200 1130211 Protective enamel “EP-140” tonne 0,0032 13 Pull box 100 × 100 × 70 mm pieces 16,000 6009 Pull box 100 × 100 × 70 mm pieces 16,0000 14 08-02- 407-1 Steel pipe on installed structures on walls, fixed with staples, diameter up to 25 mm 100 m 1,200 1 Worker man- hours 42,5040 1010813 Low-carbon steel wire for various purposes, galvanized, diameter 3.0 mm tonne 0,0025 1011924 Electrodes E42A, diameter 4 mm kg 1,2600 1019103 Spacer dowels 100 pieces 0,9840 1019852 Paint kg 0,8160 1109105 Mounting nuts for earthing connection 100 pieces 0,7800 5009030 Flanges 10 pieces 1,2240 5009031 Staples 10 pieces 4,9200 5009081 Flexible connection jumpers, type “ПГС-50” pieces 9,6000 5009140 Connection sleeves 100 pieces 0,0960 5009627 FUM tape kg 0,0360 021102 Truck crane on automobile chassis for installation of technological equipment (except main pipelines), 10 tonnes machine- hours 0,6486 030902 Hydraulic elevators, lifting capacity 10 m machine- hours 27,6000 040502 Installations for manual electric arc welding (direct current) machine- hours 8,8596 1 2 3 4 5 331451 Electric hammer drills machine- hours 8,5284 400002 Flatbed trucks, capacity up to 8 tonnes machine- hours 0,6486 15 Steel pipe, diameter 25 mm m 120,000 60011 Steel pipe, diameter 25 mm m 120,0000 Total Social insurance Transportation of materials Procurement and storage expenses Direct expenses Overhead expenses Total including overhead expenses CR) Estimated profit Total Installation Works 3. Equipment 16 120 W local power amplifier TOA or equivalent pieces 3,000 7004 120 W local power amplifier TOA pieces 3,0000 17 Ceiling loudspeakers, recessed type PC- 1867, PC-1869 – TOA or equivalent pi
Стр. 5
20 W local power amplifier TOA or
equivalent
pieces 3,000
7004 120 W local power amplifier TOA pieces 3,0000
17
Ceiling loudspeakers, recessed type PC-
1867, PC-1869 – TOA or equivalent
pieces 80,000
7006 Ceiling loudspeakers, recessed type PC-1867, PC-
1869 – TOA
pieces 80,0000
18
Announcement station (paging panel)
BOSCH LBB-1941/00 or equivalent
pieces 30,000
7008 Announcement station (paging panel) BOSCH
LBB-1941/00
pieces 30,0000
19
Wall-mounted loudspeaker, power 3–6
W, BS-678 or equivalent
pieces 5,000
70010 Wall-mounted loudspeaker, power 3–6 W, BS-
678
pieces 5,0000
Total
Procurement and storage expenses
Total Equipment
Total estimate:
Including wages
Subsemnata, Poleacova Ana, tradu cător
autorizat, (limba Englez ă), certific
exactitatea traducerii cu textul
înscrisului, care a fost vizată de mine şi
port răspundere personală pentru
corectitudinea traducerii actului.
Undersigned, Poleacova Ana, sworn translator,
(English language), certify the authenticity of
the translation which corresponds to the text
of the authentic document, which was
confirmed by me and I do take personal
responsibility for the trut hfulness of the
translation.
26.02.2026
Semnătura
Signature
Translator’s stamp: /Republic of Moldova,
Authorization AT No. 461 of 10.02.2014, AT No. 500 of 21.07.2014,
English, French, Romanian, Russian, Translator