eng18 2-12-1 ts4.rtf f1b.pdf
Стр. 1–2
Translation from Romanian and Russian into English
2026-418
Reconstruction of the terminal
building of “Eugen Doga”
International Airport – Chisinau
(cadastral no. 0100120.236.01), with
partial replanning of premises and
extension in dimensions
Form No. 1B
(name of the facility) WinEstimate
Cost Estimate-Offer No. 2-12-1
Block 1A, 1B, 1C
Voice Alarm System (VA section)
(name of works)
Coefficient for basic wages = 1,1500
Coefficient for cost of machine operation = 1,1500
No. Norm symbol
and resource
code
Description of works
Unit of
measure
(U.M.)
Quantity
according to the
design data
1 2 3 4 5
1. Construction works
1 RpEJ08C
Execution of chases with depth up to 5
cm in stone or reinforced concrete walls,
5 × 50 cm²
m 35,000
7137010011520 Electrician in construction man-
hours
8,0500
2 RpEJ09D
Filling of chases in walls up to 50 cm²
m 35,000
7122050013442 Plasterer man-
hours
12,0750
2653102100830 Construction gypsum type A kg 59,5000
1421102200525 Sorted unwashed river and lake sand 0.0–7.0 mm m³ 0,0175
4100116202818 Water for mortars and concrete m³ 0,3500
2952270003817 Electric mortar mixer, 200 L machine-
hours
0,6037
2922140006703 Window crane, capacity 0.0015 meganewtons
(MN) (0.15 ton-force (tf))
machine-
hours
0,8050
Total
Social insurance
Transportation of materials
Procurement and storage expenses
1 2 3 4 5
Direct expenses
Overhead expenses
Total including overhead expenses
(CR)
Estimated profit
Total Construction works
2. Installation Works
3 10-08-
001-01
Receiving devices: Power amplifier
pieces 4,000
1 Worker man-
hours
110,4000
1011963 Pine rosin kg 0,0224
1012206 Plastic spacer dowels, screws 12 × 70 mm 10 pieces 1,6000
5220076 Tin-lead solder alloy without antimony, grade
POS40
kg 0,2240
330206 Electric drills machine-
hours
0,7360
4 10-08-
001-11
Receiving devices: Zone controller
pieces 4,000
1 Worker man-
hours
64,4000
1010219 Gypsum binder “G-3” tonne 0,0001
1011963 Pine rosin kg 0,0160
1012206 Plastic spacer dowels, screws 12 × 70 mm 10 pieces 1,2000
5220076 Tin-lead solder alloy without antimony, grade
POS40
kg 0,1600
330206 Electric drills machine-
hours
0,5980
5 10-04-
101-07
Subscriber equipment and miscellaneous
equipment: Megaphone or loudspeaker
column: indoor
pieces 162,000
1 Worker man-
hours
372,6000
1100014 Tirfon 100
pieces
1,7820
5440089
Insulating adhesive tape on polycasing
compound, brand “LSEPL” (ЛСЭПЛ), width 20–
30 mm, thickness 0.14–0.19 mm inclusive
kg 2,4300
6 10-08-
019-01
Miscellaneous equipment: Audio box
pieces 100,000
1 Worker man-
hours
57,5000
1010219 Gypsum binder “G-3” tonne 0,0050
1010812 Galvanized low-carbon steel wire for general use,
diameter
Стр. 2–3
Miscellaneous equipment: Audio box pieces 100,000 1 Worker man- hours 57,5000 1010219 Gypsum binder “G-3” tonne 0,0050 1010812 Galvanized low-carbon steel wire for general use, diameter 1.6 mm tonne 0,0010 1011481 Screws with round head, 4 × 40 mm tonne 0,0010 7 08-02- 412-2 Pulling conductors into installed pipes and hoses: total cross-section up to 6 100 m 22,000 1 2 3 4 5 mm² 1 Worker man- hours 170,5220 1011764 Ground talc, grade I tonne 0,0132 1019852 Paint kg 0,4400 5009041 Clamping device – branch connector 100 pieces 6,8200 5009056 Insulating caps 10 pieces 17,6000 5009061 Insulating sleeve pieces 268,4000 5009140 Connection sleeves 100 pieces 1,1000 5009500 Marking tags 100 pieces 0,4400 5440089 Insulating adhesive tape on polycasing compound, brand “LSEPL” (ЛСЭПЛ), width 20– 30 mm, thickness 0.14–0.19 mm inclusive kg 3,5200 021102 Truck crane on automobile chassis for installation of technological equipment (except main pipelines), 10 tonnes machine- hours 0,5060 400002 Flatbed trucks, capacity up to 8 tonnes machine- hours 0,5060 8 Fire-resistant cable 1 × 2 × 1.5 mm² JE- H(St)H (Halogen-free installation cable with static screen) FE180 (Functional integrity 180 min) E30 (Circuit integrity 30 min) PH120 (Insulation integrity 120 min) m 2 200,000 6005 Fire-resistant cable 1 × 2 × 1.5 mm² JE-H(St)H (Halogen-free installation cable with static screen) FE180 (Functional integrity 180 min) E30 (Circuit integrity 30 min) PH120 (Insulation integrity 120 min) m 2 200,0000 9 08-02- 409-1 Vinyl plastic pipe on installed structures, on walls and columns, fixed with staples, diameter up to 25 mm 100 m 20,000 1 Worker man- hours 547,4000 1010813 Low-carbon steel wire for various purposes, galvanized, diameter 3.0 mm tonne 0,0420 1011924 Electrodes E42A, diameter 4 mm kg 19,2000 1019100 Cartridge for powder-actuated tool 10 pieces 268,0000 1019109 Connection dowels 10 pieces 268,0000 1139042 Adhesive “BMK-5k” kg 4,0000 5009030 Flanges 10 pieces 20,0000 5009031 Staples 10 pieces 134,0000 5009061 Insulating sleeve pieces 360,0000 5009070 Connections 10 pieces 36,0000 021102 Truck crane on automobile chassis for installation of technological equipment (except main pipelines), 10 tonnes machine- hours 2,5300 030902 Hydraulic elevators, lifting capacity 10 m machine- hours 363,4000 040502 Installations for manual electric arc welding machine- 62,1000
Стр. 3–5
main
pipelines), 10 tonnes
machine-
hours
2,5300
030902 Hydraulic elevators, lifting capacity 10 m machine-
hours
363,4000
040502 Installations for manual electric arc welding machine- 62,1000
1 2 3 4 5
(direct current) hours
331451 Electric hammer drills machine-
hours
111,3200
400002 Flatbed trucks, capacity up to 8 tonnes machine-
hours
2,5300
10
PVC-20 pipe (Polyvinyl Chloride)
m 2 000,000
6007 PVC-20 pipe (Polyvinyl Chloride) m 2 000,0000
11 10-06-
037-12
Cabinets, boxes and junction boxes for
conduit installations: Terminal box
100
pieces 1,600
1 Worker man-
hours
45,4848
1010985 Hot-rolled carbon steel strip, grade St6sp,
thickness 10–75 mm, width 100–200 mm
tonne 0,0096
1019103 Spacer dowels 100
pieces
3,2000
1130211 Protective enamel “EP-140” tonne 0,0320
5 Equipment weight tonne 0,0480
12
Junction box 130 × 130 × 50 mm
pieces 160,000
6009 Junction box 130 × 130 × 50 mm pieces 160,0000
Total
Social insurance
Transportation of materials
Procurement and storage expenses
Direct expenses
Overhead expenses
Total including overhead expenses
(CR)
Estimated profit
Total Installation Works
3. Equipment
13
240 W power amplifier BOSCH LBB-
1935/20 or equivalent
pieces 4,000
7004 240 W power amplifier BOSCH LBB-1935/20 pieces 4,0000
14
Zone controller (preamplifier) BOSCH
LBB-1925/10 or equivalent
pieces 4,000
7006 Zone controller (preamplifier) BOSCH LBB-
1925/10
pieces 4,0000
15
Wall-mounted loudspeaker, power 3–6
W, BS-678 or equivalent
pieces 60,000
7008 Wall-mounted loudspeaker, power 3–6 W, BS-
678
pieces 60,0000
16 Ceiling loudspeaker, power 3–6 W, PC- pieces 90,000
1 2 3 4 5
1869 or equivalent
7009 Ceiling loudspeaker, power 3–6 W, PC-1869 pieces 90,0000
17
Wall-mounted sound column, 6 W
pieces 10,000
70010 Wall-mounted sound column, 6 W pieces 10,0000
18
Horn loudspeaker, power 15 W
pieces 2,000
70011 Horn loudspeaker, power 15 W pieces 2,0000
19
Audio box
pieces 100,000
70013 Audio box pieces 100,0000
Total
Procurement and storage expenses
Total Equipment
Total estimate:
Including wages
Subsemnata, Poleacova Ana, tradu cător
autorizat, (limba Englez ă), certific
exactitatea traducerii cu textul
înscrisului, care a fost vizată de mine şi
port răspundere personală pentru
corectitudinea traducerii actului.
Undersigned, Poleacova Ana, sworn translator,
(English language), certify the authenticity of
the translation which corresponds to the text
of the authentic document, which was
confirmed by me and I do take personal
responsibility for the truthfulness of the
translation.
26.02.2026
Semnătura
Signature
Translator’s stamp: /Republic of Moldova,
Authorization AT No. 461 of 10.02.2014, AT No. 500 of 21.07.2014,
English, French, Romanian, Russian, Translat
Стр. 5
6.02.2026
Semnătura
Signature
Translator’s stamp: /Republic of Moldova,