Translation from Romanian into English  
2026-408 
                                                                                      
Reconstruction of the terminal building 
of “Eugen Doga” International Airport 
- Chisinau (cadastral no. 
0100120.236.01), including partial 
replanning of internal spaces and 
building extension 
Form No. 1B 
(name of the facility) WinEstimate 
 
Cost Estimate-Offer No. 2-3-2 
BLOCK 1C Phase 4  
 Architectural (A section) 
(name of works) 
 
Coefficient for basic wages = 1,150 
Coefficient for cost of machine operation = 1,150 
 
No. Norm 
symbol and 
resource 
code   
 
Description of works        
 
Unit of 
measure 
(U.M.)  
Quantity 
according to the 
design data 
 
1 2 3 4 5 
  1. Demolition Works 
 
   
1 RCsO56A 
 
Dismantling: timber joinery (windows)  
 m² 34,50 
 7422010060100 Carpenter (joiner) man-
hours 
12,696 
 9310060019920 Worker servicing ST man-
hours 
12,696 
2 RCsO56A 
 
Demolitions: timber joinery (exterior 
doors)  
 
m² 15,20 
 7422010060100 Carpenter (joiner) man-
hours 
5,594 
 9310060019920 Worker servicing ST man-
hours 
5,594 
3 RCsO56A 
 
Demolitions: timber joinery (exterior 
doors)  
 
m² 44,60 
 7422010060100 Carpenter (joiner) man-
hours 
16,413 
 9310060019920 Worker servicing ST man-
hours 
16,413 
4 RCsG32C 
 
Dismantling of masonry walls made of 
solid bricks, Autoclaved Aerated 
Concrete (AAC), ceramic or lightweight 
m³ 155,83
1 2 3 4 5 
concrete blocks, Gypsum Fiber Panels 
(GVP), excluding scaffolding and 
cleaning of bricks / brick walls 250 mm 
thick  
 
 7122050013400 Bricklayer man-
hours 
98,562 
 9310060019920 Worker servicing ST man-
hours 
815,38 
 4100126202818 Water m³ 18,70 
 2922140006702 Window crane machine-
hours 
14,336 
5 CL55A 
applicative 
 
DISMANTLING of ventilated façade 
system with cladding of 600 × 600 mm 
ceramic granite tiles with visible fixing (k 
= 0.5)  
Coefficient for labour input = 0,500 
Coefficient for materials = 0,500 
Coefficient for machines = 0,500 
 
m² 373,00 
 9310060019930 Worker man-
hours 
1 108,836 
 2952160007200 Lifting equipment for finishing works machine-
hours 
79,206 
 3410520001102 Truck crane 10 ton-force (tf) machine-
hours 
10,23 
 2952270007609 Electric drilling machine machine-
hours 
144,342 
 2940520004058 Disc cutting machine  machine-
hours 
1,651 
 2940520007688 Grinding machine machine-
hours 
11,367 
6 RpIzC43A 
 
Removal of insulation executed with 
mineral wool boards or similar.   
 
m² 598,80 
 7134050013240 Thermal insulator man-
hours 
103,293 
 9310060019920 Worker servicing ST man-
hours 
220,358 
 2320146200700 Kerosene l 5,988 
 1711317309326 Cleaning rags kg 17,964 
 2922140006705 Window crane, capacity 0.0018 meganewtons 
(MN) (0.18 ton-force (tf)) 
machine-
hours 
13,772 
7 RCsK41C 
 
Removal of rigid floor finishes made of 
concrete slabs, marble, stone, porcelain 
stoneware, ceramic tiles, etc. / PVC tiles 
Gerflor, t = 5 mm  
 
m² 225,20 
 7132040012700 Parquet layer man-
hours 
101,00
Стр. 2–4
 of rigid floor finishes made of 
concrete slabs, marble, stone, porcelain 
stoneware, ceramic tiles, etc. / PVC tiles 
Gerflor, t = 5 mm  
 
m² 225,20 
 7132040012700 Parquet layer man-
hours 
101,002 
 9310060019920 Worker servicing ST man-
hours 
101,002 
 4100126202818 Water m³ 11,26 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
12,949
1 2 3 4 5 
8 RCsK41A 
 
Removal of rigid floors made of concrete 
or cement mortar / cement-sand screed 
laid to slope, 45–105 mm  
 
m² 255,20 
 7132040012700 Parquet layer man-
hours 
44,022 
 9310060019920 Worker servicing ST man-
hours 
44,022 
 4100126202818 Water m³ 12,76 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
11,739 
9 RpIzC40A 
 
Removal of waterproofing executed cold 
or hot, on horizontal, inclined or vertical 
surfaces, in 1–3 layers of bituminous felt, 
fabric or felt, including the thermal 
insulation layer (polystyrene, 20 mm)  
Small materials (rags, brooms, etc.) as a 
percentage of material value = 1,200 
 
m² 255,20 
 7134030012200 Waterproofing installer man-
hours 
73,37 
 9310060019920 Worker servicing ST man-
hours 
528,264 
 4100116202818 Water for mortars and concrete  m³ 15,312 
 2320146200700 Kerosene l 30,624 
 2922140006705 Window crane, capacity 0.0018 meganewtons 
(MN) (0.18 ton-force (tf)) 
machine-
hours 
44,022 
10 RCsO56B 
 
Dismantling: wall and ceiling panelling 
made of wood, plywood, hardboard 
(PFL), particleboard (PAS), etc. / 
dismantling of gypsum plasterboard 
partition walls  
 
m² 528,00 
 7422010060100 Carpenter (joiner) man-
hours 
431,112 
 9310060019920 Worker servicing ST man-
hours 
285,384 
11 RCsG32A 
 
Demolition of masonry walls made of 
brick or Autoclaved Aerated Concrete 
(AAC), 6–8 cm thick / brick partition 
walls 120 mm  
 
m² 36,30 
 9310060019920 Worker servicing ST man-
hours 
77,228 
 4100126202818 Water m³ 0,363 
 2922140006702 Window crane machine-
hours 
2,505 
12 RCsO56A 
 
Demolitions: timber joinery (interior 
doors)  
 
m² 34,70 
 7422010060100 Carpenter (joiner) man-
hours 
12,77 
 9310060019920 Worker servicing ST man-
hours 
12,77
1 2 3 4 5 
13 RCsK41C 
 
Removal of rigid floor finishes made of 
concrete slabs, marble, stone, porcelain 
stoneware, ceramic tiles, etc. / ceramic 
granite flooring  
 
m² 22,00 
 7132040012700 Parquet layer man-
hours 
9,867 
 9310060019920 Worker servicing ST man-
hours 
9,867 
 4100126202818 Water m³ 1,10 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
1,265 
14 RpCO56C 
 
Demolitions: cladding made of wood, 
asbestos cement, hardboard, 
particleboard, etc., on walls or suspended 
ceilings, doors, etc. / suspended ceiling  
 
m² 243,50 
 7422010060100 Carpenter (joiner) man-
hours 
36,403 
 9310060019922 Service worker  man-
hours 
33,603 
15 RCsI41B 
 
Dismantling of roof elements – profiled 
sheet metal roofing  
 
m² 591,40 
 7213
Стр. 4–5
 7422010060100 Carpenter (joiner) man-
hours 
36,403 
 9310060019922 Service worker  man-
hours 
33,603 
15 RCsI41B 
 
Dismantling of roof elements – profiled 
sheet metal roofing  
 
m² 591,40 
 7213050013100 Tinsmith man-
hours 
380,862 
 9310060019920 Worker servicing ST man-
hours 
244,84 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
13,602 
16 RCsI41F 
 
Dismantling of roof elements – 
bituminous membranes in one or two 
layers  
 
m² 591,40 
 7213050013100 Tinsmith man-
hours 
455,674 
 9310060019920 Worker servicing ST man-
hours 
204,033 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
40,807 
17 RCsG32C 
 
Dismantling of masonry walls made of 
solid bricks, Autoclaved Aerated 
Concrete (AAC), ceramic or lightweight 
concrete blocks, Gypsum Fiber Panels 
(GVP), excluding scaffolding and 
cleaning of bricks /brick parapet 250 mm  
 
m³ 3,70 
 7122050013400 Bricklayer man-
hours 
2,34 
 9310060019920 Worker servicing ST man-
hours 
19,36 
 4100126202818 Water m³ 0,444 
 2922140006702 Window crane machine-
hours 
0,34
1 2 3 4 5 
18 TrB01A1-
5 
 
Transportation of materials from Group 
1–3 (loading, stacking, unloading, 
stacking), with pneumatic wheelbarrows, 
over a distance of 50 m  
 
tonne 453,00 
 9310060019900 Unskilled worker man-
hours 
562,626 
19 TrI1AA02
C2 
 
Loading of materials from Group A – 
heavy, in lumps by throwing – from ramp 
or ground, into truck category 2  
 
tonne 453,00 
 9310060019900 Unskilled worker man-
hours 
234,427 
20 TsI51A10 
 
Transportation of construction debris by 
10 tonne dump truck over a distance of 
10 kilometres  
 
tonne 453,00 
 3410540000007 Dump truck, 10 tonnes machine-
hours 
29,746 
   
 
 
   
    Total Demolition Works               
   2. Walls  
 
   
21 CK22B 
 
Aluminium profile glazed partitions in 
constructions with heights up to 35 m, 
made of fixed panels installed at floor 
level (system of prefabricated partitions 
made of aluminium profiles with infill of 
insulated glazing units and sandwich 
panels)  
 
m² 865,00 
 7214210026800 Metal structure installer  man-
hours 
905,222 
 9310060019920 Worker servicing ST man-
hours 
49,737 
 
203011295101 
System of prefabricated partitions made of 
aluminium profiles with infill of insulated glazing 
units and sandwich panels  
m² 865,00 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 3 460,00 
 2416566101572 Polyurethane foam kg 138,40 
 2430226101600 Silicone sealant kg 48,44 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 346,00 
 4011106202741 Electrical energy kw 519,00 
 2952160007200 Lifting equipment for finishing works machine-
hours 
19,895 
22 CK22B 
 
Aluminium profile glazed partitions in 
constructions with heights up to 35 m, 
made of fixed panels installed at floor 
level (System of prefabricated partitions 
made of aluminium profiles with infill of 
insulated glazing units and sandwich 
Стр. 5–7
ructions with heights up to 35 m, 
made of fixed panels installed at floor 
level (System of prefabricated partitions 
made of aluminium profiles with infill of 
insulated glazing units and sandwich 
panels, fire resistance rating EI45, and 
m² 865,00
1 2 3 4 5 
doors EI30)  
 
 7214210026800 Metal structure installer  man-
hours 
905,222 
 9310060019920 Worker servicing ST man-
hours 
49,737 
 
2030112951012 
System of prefabricated partitions made of 
aluminium profiles with infill of insulated glazing 
units and sandwich panels, fire resistance rating 
EI45, and doors EI30  
m² 865,00 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 3 460,00 
 2416566101572 Polyurethane foam kg 138,40 
 2430226101600 Silicone sealant kg 48,44 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 346,00 
 4011106202741 Electrical energy kw 519,00 
 2952160007200 Lifting equipment for finishing works machine-
hours 
19,895 
23 CD73A 
 
Walls made of lightweight panels from 
profiled sheet metal with thermal 
insulation, “Sandwich” type, mounted on 
metal or reinforced concrete purlins at 
heights under 12 m: arranged in front of 
the purlins. Note: * the brand and type of 
panel sealing shall be determined in 
accordance with the project 
documentation. (Sandwich panel EI 90 
K0)  
Small materials (silicone, self-tapping screws, 
spacer dowels) = 1,030 
 
m² 61,00 
 7214240021810 Construction locksmith (metal fitter) man-
hours 
87,688 
 9310060019922 Service worker  man-
hours 
8,418 
 2811236304903
1 
Sandwich panels *EI 90 K0 m² 64,087 
 2523156720005 Finishing profile  kg 201,056 
 2874115836895 Screws dimensions in mm 6.3/5.5 × 180 pieces 188,49 
 2874115836896 Sealing washer with EPDM rubber gasket pieces 188,49 
 2416566101572 Polyurethane foam kg 10,995 
 3410520001373 Truck crane, 5 ton-force (tf) machine-
hours 
7,015 
   
 
 
   
    Total Walls                
   3. Enclosing structures of stairwells 
 
   
24 CK11B 
 
Prefabricated shopfront glazing units, 
installed in masonry of any type, with 
area between 7.5–10.0 m², in 
constructions mounted at heights up to 5 
m inclusive, made of aluminium (BB-1, 
11450*3000)  
 
m² 34,35 
 7214210026800 Metal structure installer  man- 27,652
1 2 3 4 5 
hours 
 9310060019920 Worker servicing ST man-
hours 
1,975 
 2523146720200 Prefabricated shopfront glazing units made of 
aluminium profiles 
m² 36,068 
 2681126001472
1 
Oil for metal accessories kg 0,344 
 2430226102111 ROMALCHIT putty  kg 4,122 
 2416566101572 Polyurethane foam kg 12,022 
 2410520006700 Truck crane  machine-
hours 
0,198 
25 CK11B 
 
Prefabricated shopfront glazing units, 
installed in masonry of any type, with 
area between 7.5–10.0 m², in 
constructions mounted at heights up to 5 
m inclusive, made of aluminium (BB-2, 
10300*3000)  
 
m² 30,90 
 7214210026800 Metal structure installer  man-
hours 
24,874 
 9310060019920 Worker servicing ST man-
hours 
1,777 
 2523146720200 Prefabricated shopfront glazing units made of 
alum
Стр. 7–8
00)  
 
m² 30,90 
 7214210026800 Metal structure installer  man-
hours 
24,874 
 9310060019920 Worker servicing ST man-
hours 
1,777 
 2523146720200 Prefabricated shopfront glazing units made of 
aluminium profiles 
m² 32,445 
 2681126001472
1 
Oil for metal accessories kg 0,309 
 2430226102111 ROMALCHIT putty  kg 3,708 
 2416566101572 Polyurethane foam kg 10,815 
 2410520006700 Truck crane  machine-
hours 
0,178 
   
 
 
   
    Total Enclosing 
structures of stairwells 
              
   4. Roof 
 
   
26 CE06A 
 
Roof coverings made of profiled sheet 
metal protected against corrosion, 
corrugated or ribbed, mounted on metal 
purlins, executed on surfaces larger than 
40 m² with profiled sheets fixed with 
special clamps and mechanical screws at 
the upper flange, including execution of 
valleys, flashings, connections to 
chimneys, etc. / profiled sheet Rannila 
RAN 70  
Small materials (material for bonding sheet metal) 
= 1,050 
 
m² 1 070,60 
 7213050013100 Tinsmith man-
hours 
1 354,309 
 9310060019920 Worker servicing ST man-
hours 
123,119 
 2710403642000
2 
Galvanized corrugated or ribbed sheet / profiled 
sheet Rannila RAN 70 
m² 1 292,749 
 2710403643220 Flat galvanized sheet 0.75 mm kg 674,478
1 2 3 4 5 
 2874125886734 POP (blind) rivets pieces 5 620,65 
 2874115837746 Mechanical screws  pieces 5 620,65 
 2710703434927 Flat steel 30 × 6 mm kg 365,342 
 2430226103064 Profiled mastic cord  kg 112,413 
 2952160007200 Lifting equipment for finishing works machine-
hours 
27,086 
27 CE17A 
 
Additional polymer layer type Ondutiss 
mounted under the roofing layer of tiles, 
corrugated or embossed sheets / 
Membrane Tehnonicol Parobarrier C  
Small materials = 1,030 
 
m² 1 070,60 
 7134030012200 Waterproofing installer man-
hours 
246,238 
 9310060019920 Worker servicing ST man-
hours 
61,559 
 2682132600465 Additional polymer foil m² 1 268,126 
 2875276312000
1 
Studs (pins) pieces 13 232,616 
 2952160007200 Lifting equipment for finishing works machine-
hours 
12,312 
28 IzF14C 
 
Sound insulation layer for suspended 
ceilings made of mineral wool boards for 
general insulation, supported with 
galvanized soft steel wire / mineral wool 
Tehnoruf H35 thickness 100 mm (105–
135 kg/m³)  
 
m² 1 070,60 
 7134050013240 Thermal insulator man-
hours 
652,531 
 2682162611371
100 
Mineral wool boards Tehnoruf H35 thickness 100 
mm (105–135 kg/m³) 
m² 1 092,012 
 2734113805786 Galvanized soft steel wire d = 1 mm kg 240,885 
29 IzF14C 
 
Sound insulation layer for suspended 
ceilings made of mineral wool boards for 
general insulation, supported with 
galvanized soft steel wire / Mineral wool 
Tehnoruf B60 thickness 50 mm (165–195 
kg/m³)  
 
m² 1 070,60 
 7134050013240 Thermal insulator man-
hours 
652,531 
 2682162611371
50 
Mineral wool boards Tehnoruf B60 thickness 50 
mm  (105-135 kg/m³) 
m² 1 092,012 
 2734113805786 Galvanized soft steel wire d = 1 mm kg 240,885 
30 CE13A2 
 
Roof coverings with modified bituminous 
membranes torch-applied i
Стр. 8–9
oruf B60 thickness 50 
mm  (105-135 kg/m³) 
m² 1 092,012 
 2734113805786 Galvanized soft steel wire d = 1 mm kg 240,885 
30 CE13A2 
 
Roof coverings with modified bituminous 
membranes torch-applied in a two-layer 
system, on horizontal surfaces mounted 
on a continuous substrate (I layer – 
Tehnoelast FIX, II layer – Tehnoelast 
EKP)  
Small materials = 1,050 
 
m² 1 070,60 
 7134030012200 Waterproofing installer man- 554,035
1 2 3 4 5 
hours 
 9310060019920 Worker servicing ST man-
hours 
283,174 
 2682132600470
13 
Bituminous membrane Tehnoelast FIX m² 1 292,749 
 2682132600470
12 
Bituminous membrane Tehnoelast EKP m² 1 292,749 
 2320216201058 Butane gas (cylinders) kg 674,478 
 2921140007681 Flame burner machine-
hours 
246,238 
 2952160007200 Lifting equipment for finishing works machine-
hours 
73,871 
   
 
 
   
    Total Roof               
   5. Doors 
 
   
31 CK21A 
 
Doors made of aluminium profiles, 
including the fittings and accessories 
necessary for doors installed in masonry 
of any type, in constructions with height 
up to 35 m inclusive, single-leaf, with 
frame area up to 7 m² inclusive (U1,2 
blind interior doors, 900 × 2100 mm)  
 
m² 5,67 
 7214210026800 Metal structure installer  man-
hours 
5,542 
 9310060019920 Worker servicing ST man-
hours 
0,652 
 2812106306050
1 
Aluminium profile doors (blind) m² 5,67 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 22,68 
 2416566101572 Polyurethane foam kg 2,835 
 2430226101600 Silicone sealant kg 0,992 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 3,402 
 4011106202741 Electrical energy kw 5,67 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,13 
32 CK56A 
 
Blind interior fire-resistant door EI 45 
(U3/1, 3/2, 900 × 2100 mm)  
Small materials (rags, grease) = 1,003 
 
m² 3,78 
 9310060019930 Worker man-
hours 
19,127 
 2030112931103
1 
Blind interior fire-resistant door EI 30 m² 3,791 
 2811236309291 Anchorage details supplied separately kg 1,137 
 2873155900311 Electrodes E-42A, diameter 4 mm kg 0,19 
 2462106110356 Rubber-based adhesive No. 88-H kg 0,045 
 2416202602671 Mineral wool boards with increased rigidity based 
on synthetic mortar M-200 
m³ 0,027 
 2112227324784 Fire-retardant material with thermo-expanding 
properties 
kg 2,078 
 2112227324785 Cold smoke rubber gasket, weight 0.25 kg per 1 
m 
kg 2,597 
 2430116104162 Fire-protective enamel kg 0,417 
 2416586105304 Fire-protective primer kg 0,227 
 2112227324786 Cutting discs pieces 0,265
Стр. 9–11
5 Cold smoke rubber gasket, weight 0.25 kg per 1 
m 
kg 2,597 
 2430116104162 Fire-protective enamel kg 0,417 
 2416586105304 Fire-protective primer kg 0,227 
 2112227324786 Cutting discs pieces 0,265
1 2 3 4 5 
 2112227324787 Decorative plastic plugs pieces 9,099 
 2940520007688 Grinding machine machine-
hours 
0,956 
 2940520007610 Electric hammer drill machine-
hours 
0,652 
 2952270007609 Electric drilling machine machine-
hours 
2,869 
 2940600002994 Welding machine machine-
hours 
0,261 
 2922140006702 Window crane machine-
hours 
0,043 
33 CK21A 
 
Doors made of aluminium profiles, 
including the fittings and accessories 
necessary for doors installed in masonry 
of any type, in constructions with height 
up to 35 m inclusive, single-leaf, with 
frame area up to 7 m² inclusive (U 3/2, 
4/1 blind exterior doors, 900 × 2100 mm)  
 
m² 6,51 
 7214210026800 Metal structure installer  man-
hours 
6,364 
 9310060019920 Worker servicing ST man-
hours 
0,749 
 2812106306050
1 
Aluminium profile doors (blind) m² 6,51 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 26,04 
 2416566101572 Polyurethane foam kg 3,255 
 2430226101600 Silicone sealant kg 1,139 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 3,906 
 4011106202741 Electrical energy kw 6,51 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,15 
34 CK21D 
 
Doors made of aluminium profiles, 
including the fittings and accessories 
necessary for doors installed in masonry 
of any type, in constructions with height 
up to 35 m inclusive, double-leaf, with 
frame area up to 7 m² inclusive (U9–10 
blind interior doors, 1000 × 2100 mm)  
 
m² 8,40 
 7214210026800 Metal structure installer  man-
hours 
9,177 
 9310060019920 Worker servicing ST man-
hours 
1,063 
 2812106306050
1 
Aluminium profile doors (blind) m² 8,40 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 33,60 
 2416566101572 Polyurethane foam kg 4,62 
 2430226101600 Silicone sealant kg 1,621 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 5,04 
 4011106202741 Electrical energy kw 8,40 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,193 
35 CK21D 
 
Doors made of aluminium profiles, 
including the fittings and accessories m² 18,48
1 2 3 4 5 
necessary for doors installed in masonry 
of any type, in constructions with height 
up to 35 m inclusive, double-leaf, with 
frame area up to 7 m² inclusive (U11–12 
blind interior doors, 800 × 2100 mm)  
 
 7214210026800 Metal structure installer  man-
hours 
20,189 
 9310060019920 Worker servicing ST man-
hours 
2,338 
 2812106306050
1 
Aluminium profile doors (blind) m² 18,48 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 73,92 
 2416566101572 Polyurethane foam kg 10,164 
 2430226101600 Silicone sealant kg 3,567 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 11,088 
 4011106202741 Electrical energy kw 18,48 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,425 
36 CK56
Стр. 11–12
 kg 3,567 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 11,088 
 4011106202741 Electrical energy kw 18,48 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,425 
36 CK56A 
 
blind interior fire-resistant door EIs 60 
(U6/1, 6/2, 1300 × 2100 mm)  
Small materials (rags, grease) = 1,003 
 
m² 8,19 
 9310060019930 Worker man-
hours 
41,441 
 2030112931106
0 
Blind interior fire-resistant door EIs 60 m² 8,215 
 2811236309291 Anchorage details supplied separately kg 2,464 
 2873155900311 Electrodes E-42A, diameter 4 mm kg 0,411 
 2462106110356 Rubber-based adhesive No. 88-H kg 0,099 
 2416202602671 Mineral wool boards with increased rigidity based 
on synthetic mortar M-200 
m³ 0,058 
 2112227324784 Fire-retardant material with thermo-expanding 
properties 
kg 4,502 
 2112227324785 Cold smoke rubber gasket, weight 0.25 kg per 1 
m 
kg 5,627 
 2430116104162 Fire-protective enamel kg 0,904 
 2416586105304 Fire-protective primer kg 0,493 
 2112227324786 Cutting discs pieces 0,575 
 2112227324787 Decorative plastic plugs pieces 19,715 
 2940520007688 Grinding machine machine-
hours 
2,072 
 2940520007610 Electric hammer drill machine-
hours 
1,413 
 2952270007609 Electric drilling machine machine-
hours 
6,216 
 2940600002994 Welding machine machine-
hours 
0,565 
 2922140006702 Window crane machine-
hours 
0,094 
37 CK56A 
 
Blind interior fire-resistant door EIs 60 
(U7, 1450 × 2100 mm)  
Small materials (rags, grease) = 1,003 
 
m² 12,18 
 9310060019930 Worker man-
hours 
61,631 
 2030112931106 Blind interior fire-resistant door EIs 60 m² 12,217
1 2 3 4 5 
0 
 2811236309291 Anchorage details supplied separately kg 3,665 
 2873155900311 Electrodes E-42A, diameter 4 mm kg 0,611 
 2462106110356 Rubber-based adhesive No. 88-H kg 0,147 
 2416202602671 Mineral wool boards with increased rigidity based 
on synthetic mortar M-200 
m³ 0,086 
 2112227324784 Fire-retardant material with thermo-expanding 
properties 
kg 6,695 
 2112227324785 Cold smoke rubber gasket, weight 0.25 kg per 1 
m 
kg 8,368 
 2430116104162 Fire-protective enamel kg 1,344 
 2416586105304 Fire-protective primer kg 0,733 
 2112227324786 Cutting discs pieces 0,855 
 2112227324787 Decorative plastic plugs pieces 29,32 
 2940520007688 Grinding machine machine-
hours 
3,082 
 2940520007610 Electric hammer drill machine-
hours 
2,101 
 2952270007609 Electric drilling machine machine-
hours 
9,245 
 2940600002994 Welding machine machine-
hours 
0,84 
 2922140006702 Window crane machine-
hours 
0,14 
38 CK56A 
 
Blind interior fire-resistant door EIs 60 
(U8, 1000 × 2100 mm)  
Small materials (rags, grease) = 1,003 
 
m² 2,10 
 9310060019930 Worker man-
hours 
10,626 
 2030112931106
0 
Blind interior fire-resistant door EIs 60 m² 2,106 
 2811236309291 Anchorage details supplied separately kg 0,632 
 2873155900311 Electrodes E-42A, diameter 4 mm kg 0,105 
 2462106110356 Rubber-based adhesive No. 88-H kg 0,025 
 2416202602671 Mineral wool boards with increased rigidity
Стр. 12–13
upplied separately kg 0,632 
 2873155900311 Electrodes E-42A, diameter 4 mm kg 0,105 
 2462106110356 Rubber-based adhesive No. 88-H kg 0,025 
 2416202602671 Mineral wool boards with increased rigidity based 
on synthetic mortar M-200 
m³ 0,015 
 2112227324784 Fire-retardant material with thermo-expanding 
properties 
kg 1,154 
 2112227324785 Cold smoke rubber gasket, weight 0.25 kg per 1 
m 
kg 1,443 
 2430116104162 Fire-protective enamel kg 0,232 
 2416586105304 Fire-protective primer kg 0,126 
 2112227324786 Cutting discs pieces 0,147 
 2112227324787 Decorative plastic plugs pieces 5,055 
 2940520007688 Grinding machine machine-
hours 
0,531 
 2940520007610 Electric hammer drill machine-
hours 
0,362 
 2952270007609 Electric drilling machine machine-
hours 
1,594 
 2940600002994 Welding machine machine-
hours 
0,145 
 2922140006702 Window crane machine-
hours 
0,024 
39 CK19A 
 
Aluminium windows with one or more 
sashes in constructions with heights up to 
35 m inclusive, with frame area up to 
m² 15,75
1 2 3 4 5 
3.00 m² inclusive (O-1, 900 × 2500 (h) 
mm)  
 
 7214210026800 Metal structure installer  man-
hours 
18,112 
 9310060019920 Worker servicing ST man-
hours 
1,811 
 2030112938100 Aluminium windows m² 15,75 
 2416566101572 Polyurethane foam kg 11,104 
 2430226101600 Silicone sealant kg 3,89 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 94,50 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 9,45 
 4011106202741 Electrical energy kw 15,75 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,362 
40 CK19A 
 
Aluminium windows with one or more 
sashes in constructions with heights up to 
35 m inclusive, with frame area up to 
3.00 m² inclusive (Ф-1, 900 × 700 (h) 
mm)  
 
m² 1,26 
 7214210026800 Metal structure installer  man-
hours 
1,449 
 9310060019920 Worker servicing ST man-
hours 
0,145 
 2030112938100 Aluminium windows m² 1,26 
 2416566101572 Polyurethane foam kg 0,888 
 2430226101600 Silicone sealant kg 0,311 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 7,56 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 0,756 
 4011106202741 Electrical energy kw 1,26 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,029 
41 CK19A 
 
Aluminium windows with one or more 
sashes in constructions with heights up to 
35 m inclusive, with frame area up to 
3.00 m² inclusive (Ф-2, 1300 × 700 (h) 
mm)  
 
m² 0,91 
 7214210026800 Metal structure installer  man-
hours 
1,046 
 9310060019920 Worker servicing ST man-
hours 
0,105 
 2030112938100 Aluminium windows m² 0,91 
 2416566101572 Polyurethane foam kg 0,642 
 2430226101600 Silicone sealant kg 0,225 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 5,46 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 0,546 
 4011106202741 Electrical energy kw 0,91 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,021 
42 CK19A 
 
Aluminium windows with one or more 
sashes in constructions with hei
Стр. 13–15
 
 4011106202741 Electrical energy kw 0,91 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,021 
42 CK19A 
 
Aluminium windows with one or more 
sashes in constructions with heights up to 
35 m inclusive, with frame area up to 
m² 4,06
1 2 3 4 5 
3.00 m² inclusive (Ф-3, 1450 × 700 (h) 
mm)  
 
 7214210026800 Metal structure installer  man-
hours 
4,669 
 9310060019920 Worker servicing ST man-
hours 
0,467 
 2030112938100 Aluminium windows m² 4,06 
 2416566101572 Polyurethane foam kg 2,862 
 2430226101600 Silicone sealant kg 1,003 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 24,36 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 2,436 
 4011106202741 Electrical energy kw 4,06 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,093 
43 CK26B 
 
External aluminium window sills 
installed at windows    
 
m 16,00 
 7422010060100 Carpenter (joiner) man-
hours 
5,888 
 9310060019920 Worker servicing ST man-
hours 
1,472 
 2743123549026
5230 
External aluminium window sills  m 16,00 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 64,00 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,184 
44 CK26A 
 
Internal PVC window sills installed at 
windows (250 mm)  
Small materials (plugs) = 1,020 
 
m 16,00 
 7422010060100 Carpenter (joiner) man-
hours 
5,152 
 9310060019920 Worker servicing ST man-
hours 
1,472 
 2521106718392
250 
Internal PVC window sills (b = 250 mm) m 16,32 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 65,28 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,184 
45 CK13A1 
 
Sliding or folding double-leaf metal gates 
installed in masonry of any type, 
including the necessary accessories, with 
area up to 7 m² inclusive (P1, 4000 × 
2850 (h) mm)  
 
m² 57,00 
 7212030022700 Welder man-
hours 
12,454 
 7214210026800 Metal structure installer  man-
hours 
226,148 
 9310060019920 Worker servicing ST man-
hours 
78,66 
 7141020013300 Painter (plasterer-painter) man-
hours 
9,832 
 2812106306000
1 
Prefabricated metal doors made of steel profiles m² 57,00
1 2 3 4 5 
 1421102200496 Sorted unwashed river and lake sand 0.0–1.0 mm m³ 0,285 
 2651122100402 Metallurgical cement with additives M 30, bags 
S1500 
kg 76,95 
 4011106202741 Electrical energy kw 15,39 
 2873155900800 Welding electrodes kg 7,695 
 2430226100034 Anticorrosive red lead primer G.351-4 S 3097-80 kg 37,05 
 4100116202818 Water for mortars and concrete  m³ 0,057 
 2410520006700 Truck crane  machine-
hours 
3,277 
   
 
 
   
    Total Doors               
   6. Glazing 
 
   
  6.1. Exterior glazing (Aluminium glazing 
units with sound-insulating mirror glass 
“Planibel Dark Blue”, inner glass 
“Triplex”) 
 
   
46 CK11B 
 
Prefabricated shopfront glazing units, 
installed in masonry of any type, with 
area between 7.5–10.0 m², in 
constructions mounted at heights up to 5 
m inclusive, made of aluminium (ВН-19, 
106700 × 2550 mm, + automatic sli
Стр. 15–16
lazing units, 
installed in masonry of any type, with 
area between 7.5–10.0 m², in 
constructions mounted at heights up to 5 
m inclusive, made of aluminium (ВН-19, 
106700 × 2550 mm, + automatic sliding 
doors)  
 
m² 272,085 
 7214210026800 Metal structure installer  man-
hours 
219,028 
 9310060019920 Worker servicing ST man-
hours 
15,645 
 2523146720200 Prefabricated shopfront glazing units made of 
aluminium profiles 
m² 285,689 
 2681126001472
1 
Oil for metal accessories kg 2,721 
 2430226102111 ROMALCHIT putty  kg 32,65 
 2416566101572 Polyurethane foam kg 95,23 
 2410520006700 Truck crane  machine-
hours 
1,564 
47 CK11B 
 
Prefabricated shopfront glazing units, 
installed in masonry of any type, with 
area between 7.5–10.0 m², in 
constructions mounted at heights up to 5 
m inclusive, made of aluminium (ВН-20, 
8250 × 2550 mm, + automatic sliding 
doors of the “break-out” type, + 
automatic opening transoms in case of 
fire)  
 
m² 21,04 
 7214210026800 Metal structure installer  man-
hours 
16,937 
 9310060019920 Worker servicing ST man-
hours 
1,21 
 2523146720200 Prefabricated shopfront glazing units made of 
aluminium profiles 
m² 22,092
1 2 3 4 5 
 2681126001472
1 
Oil for metal accessories kg 0,21 
 2430226102111 ROMALCHIT putty  kg 2,525 
 2416566101572 Polyurethane foam kg 7,364 
 2410520006700 Truck crane  machine-
hours 
0,121 
48 CK11B 
 
Prefabricated shopfront glazing units, 
installed in masonry of any type, with 
area between 7.5–10.0 m², in 
constructions mounted at heights up to 5 
m inclusive, made of aluminium (ВН-21, 
70150 × 2550 mm, + automatic sliding 
doors of the “break-out” type, + 
automatic opening transoms in case of 
fire)  
 
m² 178,88 
 7214210026800 Metal structure installer  man-
hours 
143,998 
 9310060019920 Worker servicing ST man-
hours 
10,286 
 2523146720200 Prefabricated shopfront glazing units made of 
aluminium profiles 
m² 187,824 
 2681126001472
1 
Oil for metal accessories kg 1,789 
 2430226102111 ROMALCHIT putty  kg 21,466 
 2416566101572 Polyurethane foam kg 62,608 
 2410520006700 Truck crane  machine-
hours 
1,029 
49 CK11B 
 
Prefabricated shopfront glazing units, 
installed in masonry of any type, with 
area between 7.5–10.0 m², in 
constructions mounted at heights up to 5 
m inclusive, made of aluminium (ВН-22, 
6100 × 8100 mm, + automatic sliding 
doors of the “break-out” type, + 
automatic opening transoms in case of 
fire)  
 
m² 49,41 
 7214210026800 Metal structure installer  man-
hours 
39,775 
 9310060019920 Worker servicing ST man-
hours 
2,841 
 2523146720200 Prefabricated shopfront glazing units made of 
aluminium profiles 
m² 51,88 
 2681126001472
1 
Oil for metal accessories kg 0,494 
 2430226102111 ROMALCHIT putty  kg 5,929 
 2416566101572 Polyurethane foam kg 17,293 
 2410520006700 Truck crane  machine-
hours 
0,284 
   
 
 
   
    Total Exterior glazing 
(Aluminium glazing units 
with sound-insulating 
mirror glass “Planibel
Стр. 16–18
66101572 Polyurethane foam kg 17,293 
 2410520006700 Truck crane  machine-
hours 
0,284 
   
 
 
   
    Total Exterior glazing 
(Aluminium glazing units 
with sound-insulating 
mirror glass “Planibel
1 2 3 4 5 
Dark Blue”, inner glass 
“Triplex”) 
   6.2. Skylight 
 
   
50 CK10A 
 
Simple metal skylights, fixed or with 
movable sashes, installed in constructions 
of any type, including the necessary 
accessories such as: gutters for collecting 
water resulting from condensation, 
protective devices against water 
penetration from precipitation at changes 
of slopes and at glazing edges, etc. 
(Installation of skylights, dimensions 
1250 × 1250 mm, 6 pieces)  
 
m² 9,38 
 7214210026800 Metal structure installer  man-
hours 
17,799 
 7141020013300 Painter (plasterer-painter) man-
hours 
4,315 
 9310060019920 Worker servicing ST man-
hours 
1,618 
 2523146720400 Metal skylight, including accessories m² 9,38 
 2873155900800 Welding electrodes kg 0,188 
 4011106202741 Electrical energy kw 0,469 
 2430226100034 Anticorrosive red lead primer G.351-4 S 3097-80 kg 0,75 
 2651122100402 Metallurgical cement with additives M 30, bags 
S1500 
kg 11,256 
 1421102200496 Sorted unwashed river and lake sand 0.0–1.0 mm m³ 0,038 
 4100116202818 Water for mortars and concrete  m³ 0,009 
 2410520006700 Truck crane  machine-
hours 
0,216 
   
 
 
   
    Total Skylight               
    
 
 
   
    Total Glazing               
   7. Floor finishes 
 
   
  7.1. Level 1 
 
   
  7.1.1. Type Б-1  
 
   
51 CG54A 
 
Cast epoxy floor finishes. “FUXRAD” 
system “FX 47”, antistatic coating in 4 
layers, layer thickness 2.5–3.0 mm on 
existing substrate   
Small materials (rags, levelling screeds, tool 
cleaner) = 1,009 
 
m² 946,67 
 7129200011200 Finisher MP man-
hours 
2 863,203 
 9310060019922 Service worker  man-
hours 
1 219,311 
 2653102100845 Primer Fuxit-3000* kg 262,677 
 1421102200803 Quartz sand “Fuxit-9420”* kg 1 910,38
1 2 3 4 5 
 2653102100846 Levelling layer “Fuxit-3300”* kg 1 146,228 
 2653102100848 Conductive layer “Fuxit-3310”* kg 76,415 
 2653102100847 Top coat, two-component “Fuxit-3110” – current 
collector* 
kg 1 910,38 
 2653102100849 Copper tape* m 668,633 
 2653102100850 Silicon carbide “Fuxit-9471” kg 286,557 
 2881116002700 Abrasive disc pieces 19,104 
 2940520007688 Grinding machine machine-
hours 
217,734 
 2952240005106 Industrial vacuum cleaner machine-
hours 
72,941 
 2952270007607 Electric drilling machine with auger attachment machine-
hours 
217,734 
 2952160007200 Lifting equipment for finishing works machine-
hours 
21,773 
 2922140006702 Window crane machine-
hours 
10,887 
   
 
 
   
    Total Type Б-1                
   7.1.2. Type П-1  
 
   
52 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (160 -180 mm)  
 
m² 174,79 
 7132030012600 Mosaic worker man-
hours 
120,605 
 9310060019920 Worker servicing ST man-
hours 
20,101 
 2664102102010
150 
Cement mortar M150 m
Стр. 18–19
finely trowelled surface (160 -180 mm)  
 
m² 174,79 
 7132030012600 Mosaic worker man-
hours 
120,605 
 9310060019920 Worker servicing ST man-
hours 
20,101 
 2664102102010
150 
Cement mortar M150 m³ 5,768 
 4100116202818 Water for mortars and concrete  m³ 1,748 
 2952160007200 Lifting equipment for finishing works machine-
hours 
6,03 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
2,412 
53 CG01A1 
k=28 
 
Substrate layer for floors made of cement 
mortar M150, 3 cm thick, with finely 
trowelled surface. Difference in addition 
or deduction for each 0.5 cm of substrate 
layer made of cement mortar M150 shall 
be added  
Coefficient for labour input = 28,000 
Coefficient for materials = 28,000 
Coefficient for machines = 28,000 
 
m² 174,79 
 7132030012600 Mosaic worker man-
hours 
562,824 
 9310060019920 Worker servicing ST man-
hours 
112,565 
 2664102102010
150 
Cement mortar M150 m³ 26,918 
 4100116202818 Water for mortars and concrete  m³ 9,788 
 2952160007200 Lifting equipment for finishing works machine-
hours 
16,885 
 2952270003817 Electric mortar mixer, 200 L machine- 8,442
1 2 3 4 5 
hours 
54 CG50A 
 
Execution of ceramic granite floor 
finishes fixed with adhesive: tile 
dimensions under 40 × 40 cm   
 
m² 174,79 
 9310060019930 Worker man-
hours 
481,214 
 2670112202052 Ceramic granite tiles m² 177,412 
 2462106110554 Adhesive based on acrylic resins or latex kg 751,597 
 2430226100000
1 
Grout kg 34,958 
 2881116002700 Abrasive disc pieces 3,496 
 4100126202818 Water m³ 0,699 
 2952270003205 Universal stone cutting machine machine-
hours 
14,674 
 2922140006702 Window crane machine-
hours 
2,332 
 2952270007607 Electric drilling machine with auger attachment machine-
hours 
1,065 
   
 
 
   
    Total Type П-1                
   7.1.3. Type П-2  
 
   
55 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (50 mm)  
 
m² 62,69 
 7132030012600 Mosaic worker man-
hours 
43,256 
 9310060019920 Worker servicing ST man-
hours 
7,209 
 2664102102010
150 
Cement mortar M150 m³ 2,069 
 4100116202818 Water for mortars and concrete  m³ 0,627 
 2952160007200 Lifting equipment for finishing works machine-
hours 
2,163 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,865 
56 CG01A1 
k=4 
 
Substrate layer for floors made of cement 
mortar M150, 3 cm thick, with finely 
trowelled surface. Difference in addition 
or deduction for each 0.5 cm of substrate 
layer made of cement mortar M150 shall 
be added  
Coefficient for labour input = 4,000 
Coefficient for materials = 4,000 
Coefficient for machines = 4,000 
 
m² 62,69 
 7132030012600 Mosaic worker man-
hours 
28,837 
 9310060019920 Worker servicing ST man-
hours 
5,767 
 2664102102010
150 
Cement mortar M150 m³ 1,379 
 4100116202818 Water for mortars and concrete  m³ 0,502 
 2952160007200 Lifting equipment for finishing works machine- 0,865
Стр. 19–21
cing ST man-
hours 
5,767 
 2664102102010
150 
Cement mortar M150 m³ 1,379 
 4100116202818 Water for mortars and concrete  m³ 0,502 
 2952160007200 Lifting equipment for finishing works machine- 0,865
1 2 3 4 5 
hours 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,433 
57 CG50A 
 
Execution of ceramic granite floor 
finishes fixed with adhesive: tile 
dimensions under 40 × 40 cm   
 
m² 62,69 
 9310060019930 Worker man-
hours 
172,592 
 2670112202052 Ceramic granite tiles m² 63,63 
 2462106110554 Adhesive based on acrylic resins or latex kg 269,567 
 2430226100000
1 
Grout kg 12,538 
 2881116002700 Abrasive disc pieces 1,254 
 4100126202818 Water m³ 0,251 
 2952270003205 Universal stone cutting machine machine-
hours 
5,263 
 2922140006702 Window crane machine-
hours 
0,836 
 2952270007607 Electric drilling machine with auger attachment machine-
hours 
0,382 
   
 
 
   
    Total Type П-2                
   7.1.4. Type П-3  
 
   
58 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (20-40 mm)  
 
m² 37,67 
 7132030012600 Mosaic worker man-
hours 
25,992 
 9310060019920 Worker servicing ST man-
hours 
4,332 
 2664102102010
150 
Cement mortar M150 m³ 1,243 
 4100116202818 Water for mortars and concrete  m³ 0,377 
 2952160007200 Lifting equipment for finishing works machine-
hours 
1,30 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,52 
59 IzF01D2 
k=2 
 
Priming of surfaces for application of the 
diffusion layer, vapour barrier, thermal 
insulation or waterproofing on pitched 
roofs, horizontal or vertical roofs, or on 
floors of wet rooms, tanks or cold rooms, 
with anionic bituminous emulsion, in one 
layer  
Coefficient for labour input = 2,000 
Coefficient for materials = 2,000 
Coefficient for machines = 2,000 
 
m² 37,67 
 7134030012200 Waterproofing installer man-
hours 
4,332 
 2413317001000 Anionic bitumen emulsion for waterproofing kg 22,602 
 2922140006703 Window crane, capacity 0.0015 meganewtons machine- 0,026
1 2 3 4 5 
(MN) (0.15 ton-force (tf)) hours 
60 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (35 mm)  
 
m² 37,67 
 7132030012600 Mosaic worker man-
hours 
25,992 
 9310060019920 Worker servicing ST man-
hours 
4,332 
 2664102102010
150 
Cement mortar M150 m³ 1,243 
 4100116202818 Water for mortars and concrete  m³ 0,377 
 2952160007200 Lifting equipment for finishing works machine-
hours 
1,30 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,52 
61 CG01A1 
 
Substrate layer for floors made of cement 
mortar M150, 3 cm thick, with finely 
trowelled surface. Difference in addition 
or deduction for each 0.5 cm of substrate 
layer made of cement mortar M150 shall 
be added  
 
m² 37,67 
 7132030012600 Mosaic worker man-
hours 
4,332 
 9310060019920 Worker servicing ST man-
hours 
0,866 
 2664102102010
150 
Cement mortar M150 m³ 0,207 
 4100116202818 Wat
Стр. 21–22
 shall 
be added  
 
m² 37,67 
 7132030012600 Mosaic worker man-
hours 
4,332 
 9310060019920 Worker servicing ST man-
hours 
0,866 
 2664102102010
150 
Cement mortar M150 m³ 0,207 
 4100116202818 Water for mortars and concrete  m³ 0,075 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,13 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,065 
62 CG50A 
 
Execution of ceramic granite floor 
finishes fixed with adhesive: tile 
dimensions under 40 × 40 cm   
 
m² 37,67 
 9310060019930 Worker man-
hours 
103,709 
 2670112202052 Ceramic granite tiles m² 38,235 
 2462106110554 Adhesive based on acrylic resins or latex kg 161,981 
 2430226100000
1 
Grout kg 7,534 
 2881116002700 Abrasive disc pieces 0,753 
 4100126202818 Water m³ 0,151 
 2952270003205 Universal stone cutting machine machine-
hours 
3,162 
 2922140006702 Window crane machine-
hours 
0,503 
 2952270007607 Electric drilling machine with auger attachment machine-
hours 
0,23 
   
 
 
   
    Total Type П-3                
   7.1.5. Type K-1
1 2 3 4 5 
63 CI24A 
 
Cladding of steps with bonded ceramic 
granite tiles, thickness under 30 mm   
 
m² 34,30 
 9310060019930 Worker man-
hours 
152,06 
 2670112202052 Ceramic granite tiles m² 34,986 
 2462106110554 Adhesive based on acrylic resins or latex kg 198,94 
 2653102100853 Primer (undercoat) kg 5,145 
 2430226100000
1 
Grout kg 6,86 
 2881116002700 Abrasive disc pieces 0,686 
 4100126202818 Water m³ 0,171 
 2952270003205 Universal stone cutting machine machine-
hours 
13,53 
 2922140006702 Window crane machine-
hours 
1,42 
 2952270007607 Electric drilling machine with auger attachment machine-
hours 
0,284 
   
 
 
   
    Total Type K-1                
    
 
 
   
    Total Level 1               
   7.2. Level 2 
 
   
  7.2.1. Type П-4  
 
   
64 IzF53A 
 
Manual execution of floor substrate with 
thermal insulation layer made of extruded 
polystyrene boards XPS – 20 mm (ρ = 35 
kg/m³, λ = 0.032 W/mK)  
Small materials (metal bars D = 6–8 mm, length 
400 mm) = 1,015 
 
m² 650,56 
 7134050013250 Insulator man-
hours 
52,37 
 9310060019922 Service worker  man-
hours 
37,407 
 2670112204002
20 
Extruded polystyrene boards XPS – 20 mm  (ρ = 
35 kg/m³, λ = 0.032 W/mK) 
m² 673,525 
 2922140006702 Window crane machine-
hours 
2,993 
65 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (60 mm)  
 
m² 650,56 
 7132030012600 Mosaic worker man-
hours 
448,886 
 9310060019920 Worker servicing ST man-
hours 
74,814 
 2664102102010
150 
Cement mortar M150 m³ 21,468 
 4100116202818 Water for mortars and concrete  m³ 6,506 
 2952160007200 Lifting equipment for finishing works machine-
hours 
22,444 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
8,978
Стр. 22–24
 4100116202818 Water for mortars and concrete  m³ 6,506 
 2952160007200 Lifting equipment for finishing works machine-
hours 
22,444 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
8,978
1 2 3 4 5 
66 CG01A1 
k=6 
 
Substrate layer for floors made of cement 
mortar M150, 3 cm thick, with finely 
trowelled surface. Difference in addition 
or deduction for each 0.5 cm of substrate 
layer made of cement mortar M150 shall 
be added  
Coefficient for labour input = 6,000 
Coefficient for materials = 6,000 
Coefficient for machines = 6,000 
 
m² 650,56 
 7132030012600 Mosaic worker man-
hours 
448,886 
 9310060019920 Worker servicing ST man-
hours 
89,777 
 2664102102010
150 
Cement mortar M150 m³ 21,468 
 4100116202818 Water for mortars and concrete  m³ 7,807 
 2952160007200 Lifting equipment for finishing works machine-
hours 
13,467 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
6,733 
67 CG50A 
 
Execution of ceramic granite floor 
finishes fixed with adhesive: tile 
dimensions under 40 × 40 cm   
 
m² 650,56 
 9310060019930 Worker man-
hours 
1 791,057 
 2670112202052 Ceramic granite tiles m² 660,318 
 2462106110554 Adhesive based on acrylic resins or latex kg 2 797,408 
 2430226100000
1 
Grout kg 130,112 
 2881116002700 Abrasive disc pieces 13,011 
 4100126202818 Water m³ 2,602 
 2952270003205 Universal stone cutting machine machine-
hours 
54,615 
 2922140006702 Window crane machine-
hours 
8,678 
 2952270007607 Electric drilling machine with auger attachment machine-
hours 
3,965 
   
 
 
   
    Total Type П-4                
   7.2.2. Type П-5 
 
   
68 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (20...70 mm)  
 
m² 194,80 
 7132030012600 Mosaic worker man-
hours 
134,412 
 9310060019920 Worker servicing ST man-
hours 
22,402 
 2664102102010
150 
Cement mortar M150 m³ 6,428 
 4100116202818 Water for mortars and concrete  m³ 1,948 
 2952160007200 Lifting equipment for finishing works machine-
hours 
6,721
1 2 3 4 5 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
2,688 
69 CG01A1 
k=3 
 
Substrate layer for floors made of cement 
mortar M150, 3 cm thick, with finely 
trowelled surface. Difference in addition 
or deduction for each 0.5 cm of substrate 
layer made of cement mortar M150 shall 
be added  
Coefficient for labour input = 3,000 
Coefficient for materials = 3,000 
Coefficient for machines = 3,000 
 
m² 194,80 
 7132030012600 Mosaic worker man-
hours 
67,206 
 9310060019920 Worker servicing ST man-
hours 
13,441 
 2664102102010
150 
Cement mortar M150 m³ 3,214 
 4100116202818 Water for mortars and concrete  m³ 1,169 
 2952160007200 Lifting equipment for finishing works machine-
hours 
2,016 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
1,008 
70 IzF04J1 
applicative 
 
Waterproofing membrane Parobarrier B  
 m² 194,80 
 7134030012200 Waterproofing installer man-
hours 
4,48 
 2682132601626
01 
membrane Parobarrie
Стр. 24–25
0 L machine-
hours 
1,008 
70 IzF04J1 
applicative 
 
Waterproofing membrane Parobarrier B  
 m² 194,80 
 7134030012200 Waterproofing installer man-
hours 
4,48 
 2682132601626
01 
membrane Parobarrier B m² 210,384 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
0,112 
71 IzF53A 
 
Manual execution of floor substrate with 
thermal insulation layer made of extruded 
polystyrene boards Tehnonicol Carbon 
EPS PROF 300 – 100 mm (γ = 35 kg/m³, 
λ = 0.032 W/mK)  
Small materials (metal bars D = 6–8 mm, length 
400 mm) = 1,015 
 
m² 194,80 
 7134050013250 Insulator man-
hours 
15,681 
 9310060019922 Service worker  man-
hours 
11,201 
 2670112204002
10 
Extruded polystyrene boards XPS Carbon PROF 
300 – 100 mm  (ρ = 35 kg/m³, λ = 0.032 W/mK) 
m² 201,676 
 2922140006702 Window crane machine-
hours 
0,896 
72 IzF04J1 
applicative 
 
Glass fiber mat TECHNONICOL 100 
g/m²  
 
m² 194,80 
 7134030012200 Waterproofing installer man-
hours 
4,48 
 2682132601626
02 
Glass fiber mat TECHNONICOL 100 g/m² m² 210,384 
 2922140006703 Window crane, capacity 0.0015 meganewtons machine- 0,112
1 2 3 4 5 
(MN) (0.15 ton-force (tf)) hours 
73 IzF04J1 
applicative 
 
Polymer membrane ECOPLAST V-GR  
 m² 194,80 
 7134030012200 Waterproofing installer man-
hours 
4,48 
 2682132601626
03 
Polymer membrane ECOPLAST V-GR m² 210,384 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
0,112 
74 IzF04J1 
applicative 
 
Geotextile TECHNONICOL 300 g/m²  
 m² 194,80 
 7134030012200 Waterproofing installer man-
hours 
4,48 
 2682132601626
04 
Geotextile TECHNONICOL 300 g/m² m² 210,384 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
0,112 
75 CG45A 
 
Demountable raised floor finishes with 
600 × 600 mm module and height 30–80 
mm: with standardized construction 
pedestals / ceramic granite slabs 600 × 
600 mm on supporting polymer structure  
 
m² 194,80 
 9310060019930 Worker man-
hours 
71,91 
 2661126417161
1 
Ceramic granite slabs 600 × 600 × 20 mm m² 198,696 
 2811106302011 Metal pedestals for raised floors with connecting 
elements 
pieces 541,154 
 2430126108727 Epoxy enamel kg 38,96 
 2682162608364 Braided polyamide cord, diameter 2 mm kg 0,39 
 2466477300806 Polyurethane adhesive for floor pedestals kg 2,435 
 2430226100011 Putty EP-00-10  kg 33,116 
 2952160007200 Lifting equipment for finishing works machine-
hours 
5,018 
   
 
 
   
    Total Type П-5               
   7.2.3. Type П-6  
 
   
76 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (20-40 mm)  
 
m² 23,81 
 7132030012600 Mosaic worker man-
hours 
16,429 
 9310060019920 Worker servicing ST man-
hours 
2,738 
 2664102102010
150 
Cement mortar M150 m³ 0,786 
 4100116202818 Water for mortars and concrete  m³ 0,238 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,821 
 29
Стр. 25–27
hours 
2,738 
 2664102102010
150 
Cement mortar M150 m³ 0,786 
 4100116202818 Water for mortars and concrete  m³ 0,238 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,821 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,329
1 2 3 4 5 
77 IzF01D2 
k=2 
 
Priming of surfaces for application of the 
diffusion layer, vapour barrier, thermal 
insulation or waterproofing on pitched 
roofs, horizontal or vertical roofs, or on 
floors of wet rooms, tanks or cold rooms, 
with anionic bituminous emulsion, in one 
layer  
Coefficient for labour input = 2,000 
Coefficient for materials = 2,000 
Coefficient for machines = 2,000 
 
m² 23,81 
 7134030012200 Waterproofing installer man-
hours 
2,738 
 2413317001000 Anionic bitumen emulsion for waterproofing kg 14,286 
 2922140006703 Window crane, capacity 0.0015 meganewtons 
(MN) (0.15 ton-force (tf)) 
machine-
hours 
0,016 
78 CG01A 
 
Substrate layer for floors executed from 
cement mortar M150, 3 cm thick, with 
finely trowelled surface (35 mm)  
 
m² 23,81 
 7132030012600 Mosaic worker man-
hours 
16,429 
 9310060019920 Worker servicing ST man-
hours 
2,738 
 2664102102010
150 
Cement mortar M150 m³ 0,786 
 4100116202818 Water for mortars and concrete  m³ 0,238 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,821 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,329 
79 CG01A1 
 
Substrate layer for floors made of cement 
mortar M150, 3 cm thick, with finely 
trowelled surface. Difference in addition 
or deduction for each 0.5 cm of substrate 
layer made of cement mortar M150 shall 
be added  
 
m² 23,81 
 7132030012600 Mosaic worker man-
hours 
2,738 
 9310060019920 Worker servicing ST man-
hours 
0,548 
 2664102102010
150 
Cement mortar M150 m³ 0,131 
 4100116202818 Water for mortars and concrete  m³ 0,048 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,082 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,041 
80 CG50A 
 
Execution of ceramic granite floor 
finishes fixed with adhesive: tile 
dimensions under 40 × 40 cm   
 
m² 23,81 
 9310060019930 Worker man-
hours 
65,551
1 2 3 4 5 
 2670112202052 Ceramic granite tiles m² 24,167 
 2462106110554 Adhesive based on acrylic resins or latex kg 102,383 
 2430226100000
1 
Grout kg 4,762 
 2881116002700 Abrasive disc pieces 0,476 
 4100126202818 Water m³ 0,095 
 2952270003205 Universal stone cutting machine machine-
hours 
1,999 
 2922140006702 Window crane machine-
hours 
0,318 
 2952270007607 Electric drilling machine with auger attachment machine-
hours 
0,145 
   
 
 
   
    Total Type П-6                
    
 
 
   
    Total Level 2               
    
 
 
   
    Total Floor finishes               
   8. Interior finishing (Ceiling) 
 
   
  8.1. Type 1 
 
   
81 CN53A 
 
Priming of interior ceiling surfaces  
 m² 946,50 
 7141020013300 Painter (plasterer-painter) man-
hours 
32,654 
 2416586105303
2 
Primer   kg 141,975 
 810741 Dry sanding
Стр. 27–28
. Type 1 
 
   
81 CN53A 
 
Priming of interior ceiling surfaces  
 m² 946,50 
 7141020013300 Painter (plasterer-painter) man-
hours 
32,654 
 2416586105303
2 
Primer   kg 141,975 
 810741 Dry sanding paper pieces 47,325 
82 CF52B 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
ceilings, manual preparation of mortar   
 
m² 946,50 
 7122050013442 Plasterer man-
hours 
1 665,367 
 2653102100831 Dry mix kg 6 758,01 
 4100116202818 Water for mortars and concrete  m³ 3,786 
 2952160007200 Lifting equipment for finishing works machine-
hours 
85,99 
 2952240004021 Electric mixer machine-
hours 
21,225 
83 CF57A 
 
Manual application of gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m² 946,50 
 7122050013401 Mason, grade 4 man-
hours 
489,814 
 9310060019920 Worker servicing ST man-
hours 
108,847 
 2653102100833 Gypsum-based putty “Eurofin” kg 998,463 
 4100126202818 Water m³ 0,947 
 2952160007200 Lifting equipment for finishing works machine-
hours 
1,088 
84 CN53A 
 
Priming of interior wall surfaces  
 m² 946,50
1 2 3 4 5 
 7141020013300 Painter (plasterer-painter) man-
hours 
32,654 
 2416586105303
2 
Primer   kg 141,975 
 810741 Dry sanding paper pieces 47,325 
85 CN06A 
 
Interior painting with water-based vinyl 
copolymer emulsion paint, applied in 2 
coats on existing putty layer, manually 
executed  
 
m² 946,50 
 7141020013300 Painter (plasterer-painter) man-
hours 
598,661 
 2430116103800 Vinyl copolymer-based paint  kg 378,60 
 2653102100830 Construction gypsum type A kg 56,79 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 473,25 
 1711317306661 Cleaning cotton kg 47,325 
 4100116202818 Water for mortars and concrete  m³ 1,893 
   
 
 
   
    Total Type 1               
   8.2. Type 2 
 
   
86 CN53A 
 
Priming of interior ceiling surfaces  
 m² 105,40 
 7141020013300 Painter (plasterer-painter) man-
hours 
3,636 
 2416586105303
2 
Primer   kg 15,81 
 810741 Dry sanding paper pieces 5,27 
87 CF52B 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
ceilings, manual preparation of mortar (2 
mm)  
 
m² 105,40 
 7122050013442 Plasterer man-
hours 
185,451 
 2653102100831 Dry mix kg 752,556 
 4100116202818 Water for mortars and concrete  m³ 0,422 
 2952160007200 Lifting equipment for finishing works machine-
hours 
9,576 
 2952240004021 Electric mixer machine-
hours 
2,364 
88 CF53B 
k=3 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
ceilings, manual preparation of mortar. 
Difference in addition or deduction for 
each 1.0 mm (to be added to or deducted 
from item CF52)   
Coefficient for labour input = 3,000 
Coefficient for materials = 3,000 
Coefficient for machines = 3,000 
 
m² -105,40 
 7122050013442 Plasterer man-
hours 
-112,725 
 2653102100831 Dry mix kg -452,166 
 4100116202818 Water for mortars and concrete  m³ -0,316
Стр. 28–30
als = 3,000 
Coefficient for machines = 3,000 
 
m² -105,40 
 7122050013442 Plasterer man-
hours 
-112,725 
 2653102100831 Dry mix kg -452,166 
 4100116202818 Water for mortars and concrete  m³ -0,316
1 2 3 4 5 
 2952160007200 Lifting equipment for finishing works machine-
hours 
-1,455 
 2952240004021 Electric mixer machine-
hours 
-5,818 
89 CF57A 
 
Manual application of gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m² 105,40 
 7122050013401 Mason, grade 4 man-
hours 
54,544 
 9310060019920 Worker servicing ST man-
hours 
12,121 
 2653102100833 Gypsum-based putty “Eurofin” kg 111,186 
 4100126202818 Water m³ 0,105 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,121 
90 CN53A 
 
Priming of interior wall surfaces  
 m² 105,40 
 7141020013300 Painter (plasterer-painter) man-
hours 
3,636 
 2416586105303
2 
Primer   kg 15,81 
 810741 Dry sanding paper pieces 5,27 
91 CN06A 
 
Interior painting with water-based vinyl 
copolymer emulsion paint, applied in 2 
coats on existing putty layer, manually 
executed  
 
m² 105,40 
 7141020013300 Painter (plasterer-painter) man-
hours 
66,666 
 2430116103800 Vinyl copolymer-based paint  kg 42,16 
 2653102100830 Construction gypsum type A kg 6,324 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 52,70 
 1711317306661 Cleaning cotton kg 5,27 
 4100116202818 Water for mortars and concrete  m³ 0,211 
92 CK52B 
 
Suspended ceilings from “Griliato” strip 
panels on metal frame with suspension 
using strap and rod, in rooms with height 
up to 4 m / suspended metal cassette 
ceiling Griliato  
Small materials (profile selector, rags) = 1,003 
 
m² 105,40 
 9310060019930 Worker man-
hours 
107,877 
 2662102701010 “Griliato” ceiling panels  m² 107,831 
 2812106305912 Suspension with clamp and rod pieces 84,573 
 2812106305914 White 24 mm corner profiles m 118,402 
 2812106305915 Trapezoidal lamella profiles 35/30 m 88,802 
 2051142950713 Dowels for fixing metal profiles 6.0 × 40 mm pieces 22,835 
 2051142950712 Dowels for fixing ceiling suspensions 6.0 × 40 
mm 
pieces 85,63 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,436 
 2952270007609 Electric drilling machine machine-
hours 
2,933
1 2 3 4 5 
 
 
    Total Type 2               
   8.3. Type 3 
 
   
93 CK52B 
applicative 
 
Suspended ceilings made of “Griliato” 
slat panels on metal frame using 
suspension with clamp and rod, in rooms 
with height up to 4 m / suspended metal 
slatted ceiling  
Small materials (profile selector, rags) = 1,003 
 
m² 493,00 
 9310060019930 Worker man-
hours 
504,585 
 2662102701010
1 
Suspended metal slatted ceiling m² 504,369 
 2812106305912 Suspension with clamp and rod pieces 395,583 
 2812106305914 White 24 mm corner profiles m 553,816 
 2812106305915 Trapezoidal lamella profiles 35/30 m 415,362 
 2051142950713 Dowels for fixing metal profiles 6.0 × 40 mm pieces 106,807 
 2051142950712 Dowels for fixing ceiling suspensions
Стр. 30–31
m 553,816 
 2812106305915 Trapezoidal lamella profiles 35/30 m 415,362 
 2051142950713 Dowels for fixing metal profiles 6.0 × 40 mm pieces 106,807 
 2051142950712 Dowels for fixing ceiling suspensions 6.0 × 40 
mm 
pieces 400,528 
 2952160007200 Lifting equipment for finishing works machine-
hours 
2,041 
 2952270007609 Electric drilling machine machine-
hours 
13,72 
   
 
 
   
    Total Type 3               
   8.4. Type 4 
 
   
94 CE44A 
 
Roof coverings made of lightweight 
profiled sheet metal panels with thermal 
insulation, type “Sandwich” EI90, 
mounted on metal purlins. Note: * the 
brand and type of panel sealing shall be 
determined in accordance with the project 
documentation.     
Small materials (silicone, self-tapping screws) = 
1,020 
 
m² 275,50 
 7214210026800 Metal structure installer  man-
hours 
380,19 
 9310060019920 Worker servicing ST man-
hours 
95,047 
 2811236304903 “Sandwich” panels * m² 286,63 
 2523156720006 Finishing profile (including ridge joint)  kg 725,006 
 2874115836897 Screws, dimensions in mm 6.3/5.5 × 235 pieces 843,03 
 2874115836896 Sealing washer with EPDM rubber gasket pieces 843,03 
 2416566101572 Polyurethane foam kg 50,863 
 2952160007200 Lifting equipment for finishing works machine-
hours 
15,841 
   
 
 
   
    Total Type 4               
    
 
 
   
    Total Interior finishing
1 2 3 4 5 
(Ceiling) 
   9. Interior finishing (Walls) 
 
   
  9.1. Type 1 (external walls) 
 
   
95 CF02B 
 
Interior plastering 2 cm thick, trowelled, 
manually executed, on walls or columns, 
on plane surfaces with cement-lime 
mortar grade M100-T for splash coat, 
base coat and finishing coat, on brick 
masonry or small concrete blocks / 25 
mm  
 
m² 761,00 
 7122050013400 Bricklayer man-
hours 
875,15 
 9310060019920 Worker servicing ST man-
hours 
175,03 
 2664102103001 Cement-lime mortar  m³ 15,981 
 4100116202818 Water for mortars and concrete  m³ 4,946 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
4,376 
 2952160007200 Lifting equipment for finishing works machine-
hours 
1,75 
96 CF17B 
 
Various works – thickness difference, ±5 
mm to base coat layer applied on walls, 
executed with mortar  
 
m² 761,00 
 7122050013400 Bricklayer man-
hours 
87,515 
 9310060019920 Worker servicing ST man-
hours 
26,254 
 2664102100000 Mortar m³ 4,566 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,875 
97 CN53A 
 
Priming of interior wall surfaces  
 m² 761,00 
 7141020013300 Painter (plasterer-painter) man-
hours 
26,254 
 2416586105303
2 
Primer   kg 114,15 
 810741 Dry sanding paper pieces 38,05 
98 CF50B 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
walls and partition walls, manual 
preparation of mortar / 2 mm  
 
m² 761,00 
 7122050013442 Plasterer man-
hours 
1 067,683 
 2653102100831 Dry mix kg 5 433,54 
 4100116202818 Water for mortars and concrete  m³ 3,044 
 2952160007200 Lifting equipment for finishing works machine-
hours 
69,137
Стр. 31–33
lasterer man-
hours 
1 067,683 
 2653102100831 Dry mix kg 5 433,54 
 4100116202818 Water for mortars and concrete  m³ 3,044 
 2952160007200 Lifting equipment for finishing works machine-
hours 
69,137 
 2952240004021 Electric mixer machine-
hours 
14,002
1 2 3 4 5 
99 CF51B 
k=3 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
walls and partition walls, manual 
preparation of mortar. Difference in 
addition or deduction for each 1.0 mm (to 
be added to or deducted from item CF50)   
Coefficient for labour input = 3,000 
Coefficient for materials = 3,000 
Coefficient for machines = 3,000 
 
m² -761,00 
 7122050013442 Plasterer man-
hours 
-630,108 
 2653102100831 Dry mix kg -3 264,69 
 4100116202818 Water for mortars and concrete  m³ -2,283 
 2952160007200 Lifting equipment for finishing works machine-
hours 
-42,007 
 2952240004021 Electric mixer machine-
hours 
-7,876 
100 CF57A 
 
Manual application of gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m² 761,00 
 7122050013401 Mason, grade 4 man-
hours 
393,817 
 9310060019920 Worker servicing ST man-
hours 
87,515 
 2653102100833 Gypsum-based putty “Eurofin” kg 802,779 
 4100126202818 Water m³ 0,761 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,875 
101 CN54A 
 
Manual application of quartz primer 
“Gleta” in one layer, on interior walls and 
ceilings  
 
m² 761,00 
 7141020013301 Painter (plasterer-painter), grade 3 man-
hours 
122,521 
 2430226101010 Quartz primer “Gleta” kg 315,815 
 810741 Dry sanding paper pieces 38,05 
102 CN06A 
 
Interior painting with water-based vinyl 
copolymer emulsion paint, applied in 2 
coats on existing putty layer, manually 
executed  
 
m² 761,00 
 7141020013300 Painter (plasterer-painter) man-
hours 
481,332 
 2430116103800 Vinyl copolymer-based paint  kg 304,40 
 2653102100830 Construction gypsum type A kg 45,66 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 380,50 
 1711317306661 Cleaning cotton kg 38,05 
 4100116202818 Water for mortars and concrete  m³ 1,522 
   
 
 
   
    Total Type 1 (external 
walls) 
              
   9.2. Type 2 (partition walls, columns)
1 2 3 4 5 
 
103 CN53A 
 
Priming of interior wall surfaces  
 m² 458,40 
 7141020013300 Painter (plasterer-painter) man-
hours 
15,815 
 2416586105303
2 
Primer   kg 68,76 
 810741 Dry sanding paper pieces 22,92 
104 CF50B 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
walls and partition walls, manual 
preparation of mortar    
 
m² 458,40 
 7122050013442 Plasterer man-
hours 
643,135 
 2653102100831 Dry mix kg 3 272,976 
 4100116202818 Water for mortars and concrete  m³ 1,834 
 2952160007200 Lifting equipment for finishing works machine-
hours 
41,646 
 2952240004021 Electric mixer machine-
hours 
8,435 
105 CF57A 
 
Manual application of gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m²
Стр. 33–34
rs 
41,646 
 2952240004021 Electric mixer machine-
hours 
8,435 
105 CF57A 
 
Manual application of gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m² 458,40 
 7122050013401 Mason, grade 4 man-
hours 
237,222 
 9310060019920 Worker servicing ST man-
hours 
52,716 
 2653102100833 Gypsum-based putty “Eurofin” kg 483,566 
 4100126202818 Water m³ 0,458 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,527 
106 CN54A 
 
Manual application of quartz primer 
“Gleta” in one layer, on interior walls and 
ceilings  
 
m² 458,40 
 7141020013301 Painter (plasterer-painter), grade 3 man-
hours 
73,802 
 2430226101010 Quartz primer “Gleta” kg 190,236 
 810741 Dry sanding paper pieces 22,92 
107 CN06A 
 
Interior painting with water-based vinyl 
copolymer emulsion paint, applied in 2 
coats on existing putty layer, manually 
executed  
 
m² 458,40 
 7141020013300 Painter (plasterer-painter) man-
hours 
289,938 
 2430116103800 Vinyl copolymer-based paint  kg 183,36 
 2653102100830 Construction gypsum type A kg 27,504 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 229,20 
 1711317306661 Cleaning cotton kg 22,92 
 4100116202818 Water for mortars and concrete  m³ 0,917
1 2 3 4 5 
    Total Type 2 (partition 
walls, columns) 
              
   9.3. Type 3 (window sill section) 
 
   
108 CF02B 
 
Interior plastering 2 cm thick, trowelled, 
manually executed, on walls or columns, 
on plane surfaces with cement-lime 
mortar grade M100-T for splash coat, 
base coat and finishing coat, on brick 
masonry or small concrete blocks / 25 
mm  
 
m² 146,30 
 7122050013400 Bricklayer man-
hours 
168,245 
 9310060019920 Worker servicing ST man-
hours 
33,649 
 2664102103001 Cement-lime mortar  m³ 3,072 
 4100116202818 Water for mortars and concrete  m³ 0,951 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,336 
 2952270003817 Electric mortar mixer, 200 L machine-
hours 
0,841 
109 CF17B 
 
Various works – thickness difference, ±5 
mm to base coat layer applied on walls, 
executed with mortar  
 
m² 146,30 
 7122050013400 Bricklayer man-
hours 
16,825 
 9310060019920 Worker servicing ST man-
hours 
5,047 
 2664102100000 Mortar m³ 0,878 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,168 
110 CN53A 
 
Priming of interior wall surfaces  
 m² 146,30 
 7141020013300 Painter (plasterer-painter) man-
hours 
5,047 
 2416586105303
2 
Primer   kg 21,945 
 810741 Dry sanding paper pieces 7,315 
111 CF50B 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
walls and partition walls, manual 
preparation of mortar / 2 mm  
 
m² 146,30 
 7122050013442 Plasterer man-
hours 
205,259 
 2653102100831 Dry mix kg 1 044,582 
 4100116202818 Water for mortars and concrete  m³ 0,585 
 2952160007200 Lifting equipment for finishing works machine-
hours 
13,291 
 2952240004021 Electric mixer machine-
hours 
2,692 
112 CF51B Interior plastering 5 
Стр. 34–36
r for mortars and concrete  m³ 0,585 
 2952160007200 Lifting equipment for finishing works machine-
hours 
13,291 
 2952240004021 Electric mixer machine-
hours 
2,692 
112 CF51B Interior plastering 5 mm thick, manually m² -146,30
1 2 3 4 5 
k=3 
 
executed, with dry gypsum-based mix, on 
walls and partition walls, manual 
preparation of mortar. Difference in 
addition or deduction for each 1.0 mm (to 
be added to or deducted from item CF50)   
Coefficient for labour input = 3,000 
Coefficient for materials = 3,000 
Coefficient for machines = 3,000 
 
 7122050013442 Plasterer man-
hours 
-121,136 
 2653102100831 Dry mix kg -627,627 
 4100116202818 Water for mortars and concrete  m³ -0,439 
 2952160007200 Lifting equipment for finishing works machine-
hours 
-8,076 
 2952240004021 Electric mixer machine-
hours 
-1,514 
113 CF57A 
 
Manual application of gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m² 146,30 
 7122050013401 Mason, grade 4 man-
hours 
75,71 
 9310060019920 Worker servicing ST man-
hours 
16,825 
 2653102100833 Gypsum-based putty “Eurofin” kg 154,332 
 4100126202818 Water m³ 0,146 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,168 
114 CN54A 
 
Manual application of quartz primer 
“Gleta” in one layer, on interior walls and 
ceilings  
 
m² 146,30 
 7141020013301 Painter (plasterer-painter), grade 3 man-
hours 
23,554 
 2430226101010 Quartz primer “Gleta” kg 60,715 
 810741 Dry sanding paper pieces 7,315 
115 CN06A 
 
Interior painting with water-based vinyl 
copolymer emulsion paint, applied in 2 
coats on existing putty layer, manually 
executed  
 
m² 146,30 
 7141020013300 Painter (plasterer-painter) man-
hours 
92,535 
 2430116103800 Vinyl copolymer-based paint  kg 58,52 
 2653102100830 Construction gypsum type A kg 8,778 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 73,15 
 1711317306661 Cleaning cotton kg 7,315 
 4100116202818 Water for mortars and concrete  m³ 0,293 
   
 
 
   
    Total Type 3 (window sill 
section) 
              
   9.4. Type 4 (partition walls, columns)
1 2 3 4 5 
116 CN53A 
 
Priming of interior wall surfaces  
 m² 560,00 
 7141020013300 Painter (plasterer-painter) man-
hours 
19,32 
 2416586105303
2 
Primer   kg 84,00 
 810741 Dry sanding paper pieces 28,00 
117 CF50B 
 
Interior plastering 5 mm thick, manually 
executed, with dry gypsum-based mix, on 
walls and partition walls, manual 
preparation of mortar    
 
m² 560,00 
 7122050013442 Plasterer man-
hours 
785,68 
 2653102100831 Dry mix kg 3 998,40 
 4100116202818 Water for mortars and concrete  m³ 2,24 
 2952160007200 Lifting equipment for finishing works machine-
hours 
50,876 
 2952240004021 Electric mixer machine-
hours 
10,304 
118 CF57A 
 
Manual application of gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m² 560,00 
 7122050013401 Mason, grade 4 man-
hours 
289,80 
 9310060019920 Worker servicing ST man-
Стр. 36–37
f gypsum-based 
putty “Eurofin”, thickness 1.0 mm, on 
surfaces of walls, columns and ceilings   
 
m² 560,00 
 7122050013401 Mason, grade 4 man-
hours 
289,80 
 9310060019920 Worker servicing ST man-
hours 
64,40 
 2653102100833 Gypsum-based putty “Eurofin” kg 590,744 
 4100126202818 Water m³ 0,56 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,644 
119 CN54A 
 
Manual application of quartz primer 
“Gleta” in one layer, on interior walls and 
ceilings  
 
m² 560,00 
 7141020013301 Painter (plasterer-painter), grade 3 man-
hours 
90,16 
 2430226101010 Quartz primer “Gleta” kg 232,40 
 810741 Dry sanding paper pieces 28,00 
120 CN06A 
 
Interior painting with water-based vinyl 
copolymer emulsion paint, applied in 2 
coats on existing putty layer, manually 
executed  
 
m² 560,00 
 7141020013300 Painter (plasterer-painter) man-
hours 
354,20 
 2430116103800 Vinyl copolymer-based paint  kg 224,00 
 2653102100830 Construction gypsum type A kg 33,60 
 2681126001472 Dry sandpaper 23 × 30 cm, grit 6 pieces 280,00 
 1711317306661 Cleaning cotton kg 28,00 
 4100116202818 Water for mortars and concrete  m³ 1,12 
   
 
 
   
    Total Type 4 (partition
1 2 3 4 5 
walls, columns) 
   9.5. Finishing of the wall and partition 
walls in the lower part 
 
   
121 CD07B 
 
Walls made of corrugated galvanized 
sheet panels fixed with self-tapping 
screws, installed at a height up to 6 m 
inclusive (cladding with HPL panels – 
High Pressure Laminate)  
 
m² 99,30 
 7214240021810 Construction locksmith (metal fitter) man-
hours 
114,195 
 2732103646070
2 
HPL panels (High Pressure Laminate) m² 110,223 
 2874125886734 POP (blind) rivets pieces 347,55 
 2874115833878 Self-tapping screws 6.3 × 22 mm pieces 278,04 
 2922140007000 Crane  machine-
hours 
4,568 
122 CD07B 
 
Walls made of corrugated galvanized 
sheet panels fixed with self-tapping 
screws, installed at a height up to 6 m 
inclusive / stainless steel  
 
m² 4,90 
 7214240021810 Construction locksmith (metal fitter) man-
hours 
5,635 
 2732103646070
21 
Stainless steel m² 5,439 
 2874125886734 POP (blind) rivets pieces 17,15 
 2874115833878 Self-tapping screws 6.3 × 22 mm pieces 13,72 
 2922140007000 Crane  machine-
hours 
0,225 
123 RCsP38F 
 
Aluminium frame  
 tonne 0,13 
 7214210026800 Metal structure installer  man-
hours 
6,055 
 9310060019922 Service worker  man-
hours 
0,598 
 2811106301200
1 
Aluminium frame kg 130,00 
 2735725901235 Covered electrode E 51 2R 2 × 350 mm S 1125/2 kg 0,065 
 2874115802501 Bolt M20  pieces 1,30 
 2874115840601 Hexagonal nut M20 pieces 1,30 
 2874115883700 Washer M20 pieces 1,30 
 2413547308164 Technical calcium carbide (carbide) S102 kg 0,016 
 2411115904512 Technical gaseous oxygen S2031 m³ 0,023 
 2811236309900 Metal fabrications  kg 0,13 
 2410520006751 Truck crane, 4.5–9.9 ton-force (TF); machine-
hours 
0,149 
 3110500003004 Welding inverter, 14 kW  machine-
hours 
0,075 
   
 
 
   
    Total Finishing of the 
wall and partition walls in 
Стр. 37–39
20006751 Truck crane, 4.5–9.9 ton-force (TF); machine-
hours 
0,149 
 3110500003004 Welding inverter, 14 kW  machine-
hours 
0,075 
   
 
 
   
    Total Finishing of the 
wall and partition walls in 
the lower part
1 2 3 4 5 
    Total Interior finishing 
(Walls) 
              
   10. Exterior finishing 
 
   
  10.1. Ventilated façade from ceramic 
granite panels 
 
   
124 CL53A 
 
Installation of ventilated façade system 
with cladding of building walls and 
structures with linear metal panels 
arranged horizontally with concealed 
fixing, with architectural details surface 
up to 30% of the total wall surface. Note: 
the resource with norm 0.00 (zero) shall 
be taken in accordance with the project 
(Aluminium composite panel made of 
ACP)  
Small materials (self-tapping screws) = 1,005 
 
m² 335,80 
 9310060019930 Worker man-
hours 
647,607 
 
2811236304899
1 
Linear metal façade panels with complete set of 
substructure elements and fixing components for 
ventilated façade cladding (brackets, bearing 
profiles, anchors, clamps, etc.)  (Aluminium 
composite panel made of AK-AR) 
m² 371,227 
 2521302602900 Thermal insulation boards m² 347,603 
 2614122601913 Glass fiber mat type 160 g/m² m² 371,227 
 2523156719204 Plastic dowels with screws 8 × 100 reinforced 
with glass fibers 
pieces 2 531,092 
 3410520001102 Truck crane 10 ton-force (tf) machine-
hours 
7,723 
 2952160007200 Lifting equipment for finishing works machine-
hours 
88,433 
 2940520007609 Electric drill with carbide (widia) bit machine-
hours 
15,447 
 2952270007609 Electric drilling machine machine-
hours 
106,197 
 2940520004058 Disc cutting machine  machine-
hours 
1,699 
   
 
 
   
    Total Ventilated façade 
from ceramic granite 
panels 
              
   10.2. Node 1 (Parapet cladding along axis 
“RAZ”) 
 
   
125 CD08A1 
 
Fiber cement boards FC thickness 12 mm 
(walls made of cement-bonded particle 
boards CBPB – 12 mm)  
Small materials (galvanized metal accessories for 
walls, sealing compound for gaskets) = 1,050 
 
m² 123,00 
 7214240021810 Construction locksmith (metal fitter) man- 114,575
1 2 3 4 5 
hours 
 2521306717875
12 
Fiber cement boards FC thickness 12 mm (walls 
made of cement-bonded particle boards CBPB – 
12 mm) 
m² 180,81 
 2874125886734 POP (blind) rivets pieces 516,60 
 2922140007000 Crane  machine-
hours 
7,072 
126 CD73A 
 
Walls made of lightweight panels from 
profiled sheet metal with thermal 
insulation, “Sandwich” type, mounted on 
metal or reinforced concrete purlins at 
heights under 12 m: arranged in front of 
the purlins. Note: (Sandwich panels type 
IZOTHERM SCw thickness 100 mm, 
with mineral wool board core)  
Small materials (silicone, self-tapping screws, 
spacer dowels) = 1,030 
 
m² 243,20 
 7214240021810 Construction locksmith (metal fitter) man-
hours 
349,60 
 9310060019922 Service worker  man-
hours 
33,562 
 2811236304903
100 
Sandwich panels – 100 mm (walls) m² 255,506 
 2523156720005 Finishing profile  kg 801,587 
 2874115
Стр. 39–40
l fitter) man-
hours 
349,60 
 9310060019922 Service worker  man-
hours 
33,562 
 2811236304903
100 
Sandwich panels – 100 mm (walls) m² 255,506 
 2523156720005 Finishing profile  kg 801,587 
 2874115836895 Screws dimensions in mm 6.3/5.5 × 180 pieces 751,488 
 2874115836896 Sealing washer with EPDM rubber gasket pieces 751,488 
 2416566101572 Polyurethane foam kg 43,837 
 3410520001373 Truck crane, 5 ton-force (tf) machine-
hours 
27,968 
127 CD73A 
 
Walls made of lightweight panels from 
profiled sheet metal with thermal 
insulation, “Sandwich” type, mounted on 
metal or reinforced concrete purlins at 
heights under 12 m: arranged in front of 
the purlins. Note: (Sandwich panels type 
IZOTHERM SCw thickness 50 mm, with 
mineral wool board core)  
Small materials (silicone, self-tapping screws, 
spacer dowels) = 1,030 
 
m² 226,90 
 7214240021810 Construction locksmith (metal fitter) man-
hours 
326,169 
 9310060019922 Service worker  man-
hours 
31,312 
 2811236304903
50 
Sandwich panels – 50 mm (roof) m² 238,381 
 2523156720005 Finishing profile  kg 747,862 
 2874115836895 Screws dimensions in mm 6.3/5.5 × 180 pieces 701,121 
 2874115836896 Sealing washer with EPDM rubber gasket pieces 701,121 
 2416566101572 Polyurethane foam kg 40,899 
 3410520001373 Truck crane, 5 ton-force (tf) machine-
hours 
26,093 
128 IzF14B 
 
Sound insulation layer executed with 
mineral wool boards TEHNOVENT m² 229,50
1 2 3 4 5 
thickness 30 mm  
 
 7134050013240 Thermal insulator man-
hours 
42,228 
 2682162611373
0 
Mineral wool boards TEHNOVENT thickness 30 
mm 
m² 234,09 
129 CD07A1 
 
Walls made of corrugated galvanized 
sheet panels fixed by shooting onto metal 
framework, installed at a height greater 
than 6 m / aluminium composite panel 
(ACP)  
 
m² 505,80 
 7214240021810 Construction locksmith (metal fitter) man-
hours 
552,586 
 2732103646070
1 
Corrugated sheet aluminium composite panel 
(ACP) 
m² 561,438 
 2874125886734 POP (blind) rivets pieces 1 770,30 
 2874115893397 Tornado bolt K 6/20 OL50 pieces 1 416,24 
 2461117308504 Cartridges for TORNADO bolt gun pieces 1 416,24 
 2922140007000 Crane  machine-
hours 
29,084 
130 CL54B 
 
Façade system made of extruded 
aluminium lamellas.  
 
m² 196,20 
 9310060019930 Worker man-
hours 
328,179 
 2811236304901
1 
Façade system LINIUS (made of extruded 
aluminium lamellas) 
m² 231,516 
 2614122601913 Glass fiber mat type 160 g/m² m² 202,086 
 2952160007200 Lifting equipment for finishing works machine-
hours 
23,42 
 2952270007609 Electric drilling machine machine-
hours 
47,834 
 2940520004058 Disc cutting machine  machine-
hours 
2,708 
 2940520007609 Electric drill with carbide (widia) bit machine-
hours 
6,995 
131 IzF14B 
 
Sound insulation layer executed with 
mineral wool boards Tehnoruf H35 
thickness 100 mm  
 
m² 14,60 
 7134050013240 Thermal insulator man-
hours 
2,686 
 2682162611371
00 
Mineral wool boards Tehnoruf H35 thickness 100 
mm 
m² 14,892 
132 CK26B 
 
Flashing strip Rannila 120 mm  
 m
Стр. 40–41
0 mm  
 
m² 14,60 
 7134050013240 Thermal insulator man-
hours 
2,686 
 2682162611371
00 
Mineral wool boards Tehnoruf H35 thickness 100 
mm 
m² 14,892 
132 CK26B 
 
Flashing strip Rannila 120 mm  
 m 418,60 
 7422010060100 Carpenter (joiner) man-
hours 
154,045 
 9310060019920 Worker servicing ST man-
hours 
38,511 
 2743123549026
52301 
Flashing strip Rannila 120 mm m 418,60 
 2874115829126 Countersunk slotted screws 6 × 30 mm pieces 1 674,40 
 2952160007200 Lifting equipment for finishing works machine- 4,814
1 2 3 4 5 
hours 
133 СF59A 
 
Cladding of surfaces with one layer of 
gypsum plasterboard (GYP) 12.5 mm 
with execution of single flat metal 
framework, with height up to 4 m: walls 
without insulation  
Small materials (water, sanding paper, etc.) = 
1,005 
 
m² 215,70 
 9310060019930 Worker man-
hours 
443,274 
 2662102701000 Gypsum plasterboard panels 12.5 mm m² 227,617 
 2710703520284 Guide profile m 159,332 
 2710703520285 Support profile m 476,913 
 2521302602900 Thermal insulation boards m² 223,282 
 2523156720072 Sealing tape under profiles “Dihtungsband” m 509,429 
 2513206621602 Joint tape “Serpeanca” m 164,21 
 2430226102822 Gypsum-based joint compound “Fugenfüller 
Leicht” 
kg 58,747 
 2430226101017 Primer “Tiefengrund” kg 18,968 
 2051142950711
1 
Dowels with screws 8 × 80 mm for fixing metal 
profiles 
pieces 325,168 
 2874115833871 Self-tapping screws 3.5 × 25 mm pieces 2 798,61 
 2952160007200 Lifting equipment for finishing works machine-
hours 
1,588 
 2952270007609 Electric drilling machine machine-
hours 
10,468 
   
 
 
   
    Total Node 1 (Parapet 
cladding along axis 
“RAZ”) 
              
   10.3. Node 2 (Gutter + hoppers, 7 pieces) 
 
   
134 CE05B1 
 
Roof coverings made of flat galvanized 
sheet metal or flat sheet metal protected 
against corrosion, fixed with clamps, 
executed with double seams in both 
directions, carried out on surfaces smaller 
than or equal to 40 m² with sheets of 0.5 
mm thickness, including execution of 
valleys, flashings, connections to 
chimneys, etc. 
Small materials (mineral oil, zinc white, tin, alloy, 
ready-prepared red lead paint) = 1,050 
 
m² 0,80 
 7213050013100 Tinsmith man-
hours 
0,874 
 9310060019920 Worker servicing ST man-
hours 
0,046 
 2710403642299 Flat galvanized sheet 0.5 × 1000 × 650 mm kg 4,662 
 2873145887450 Sheet metal nails kg 0,025 
 2873147300863 Clamps kg 0,21 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,009
Стр. 41–43
Flat galvanized sheet 0.5 × 1000 × 650 mm kg 4,662 
 2873145887450 Sheet metal nails kg 0,025 
 2873147300863 Clamps kg 0,21 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,009
1 2 3 4 5 
135 IzF53A 
 
Manual execution of floor substrate with 
thermal insulation layer made of extruded 
polystyrene boards XPS – 40 mm    
Small materials (metal bars D = 6–8 mm, length 
400 mm) = 1,015 
 
m² 47,90 
 7134050013250 Insulator man-
hours 
3,856 
 9310060019922 Service worker  man-
hours 
2,754 
 2670112204002
40 
Extruded polystyrene boards XPS – 40 mm m² 49,591 
 2922140006702 Window crane machine-
hours 
0,22 
136 IzF14B 
 
Sound insulation layer executed with 
mineral wool boards TEHNOVENT 
thickness 30 mm  
 
m² 69,70 
 7134050013240 Thermal insulator man-
hours 
12,825 
 2682162611373
0 
Mineral wool boards TEHNOVENT thickness 30 
mm 
m² 71,094 
137 CE05A 
 
Roof coverings made of flat galvanized 
sheet metal or flat sheet metal protected 
against corrosion, fixed with clamps, 
executed with double seams in both 
directions, carried out on surfaces larger 
than 40 m² with sheets of 0.4 mm 
thickness, including execution of valleys, 
flashings, connections to chimneys, etc.  
Small materials (mineral oil, zinc white, tin, alloy, 
ready-prepared red lead paint) = 1,050 
 
m² 69,70 
 7213050013100 Tinsmith man-
hours 
60,116 
 9310060019920 Worker servicing ST man-
hours 
4,008 
 2710403641817 Flat galvanized sheet 0.4 × 1000 × 650 mm kg 325,673 
 2873145887450 Sheet metal nails kg 2,196 
 2873147300863 Clamps kg 18,296 
 2952160007200 Lifting equipment for finishing works machine-
hours 
0,802 
   
 
 
   
    Total Node 2 (Gutter + 
hoppers, 7 pieces) 
              
    
 
 
   
    Total Exterior finishing
Total   
 Social fund   
 Total   
 Transportation of materials   
 Storage expenses   
 Direct expenses   
 Overhead expenses   
 Total   
 Estimated profit   
 
Total estimate: 
Including wages     
 
 
Subsemnata, Poleaco va Ana, tradu cător 
autorizat, (limba Englez ă), certific 
exactitatea traducerii cu textul 
înscrisului, care a fost vizată de mine şi 
port răspundere personală pentru 
corectitudinea traducerii actului.   
Undersigned, Poleacova Ana, sworn translator, 
(English language), certify the authenticity of 
the translation which corresponds to the text 
of the authentic document, which was 
confirmed by me and I do take personal 
responsibility for the truthfulness of the 
translation.  
26.02.2026 
      Semnătura 
Signature  
 
 
Translator’s stamp: /Republic of Moldova,  
Authorization AT No. 461 of 10.02.2014, AT No. 500 of 21.07.2014,  
English, French, Romanian, Russian, Translator
Стр. 43
02.2026 
      Semnătura 
Signature  
 
 
Translator’s stamp: /Republic of Moldova,  